Similar Projects
Briarcliffe Acres Resurfacing Project
Bidding
$162,000 to $225,000 est. value
Myrtle Beach, SC

Asphalt Paving and Traffic Control for a Transportation Infrastructure Generating Economic Recovery (TIGER) Project
Post-Bid
SC

Tiger Grant 15 - Asphalt Paving and Traffic Control
Post-Bid
$35,000 to $55,000 est. value
SC

Group 6 Roadway Repair and Resurfacing Project
Results
SC

Tom Dorman Road and Hardee Road, Road Improvement Project
Results
Less than $738,876 est. value
SC

Reconstruction/Rehabilitation - District 5
Post-Bid

Bennet Loop Resurfacing Project
Results
Less than $189,672 est. value
SC

Reconstruction/Rehabilitation - District 5
Post-Bid

Bratcher Road - Road Improvement Project
Results
Less than $280,172 est. value
Conway, SC 29526

Intersection Improvements - US 378 at S-134
Results
SC

Dorchester Road and Harvey Road, Road Improvement Projects
Results
Less than $899,623 est. value
Conway, SC 29526

On-Call Pavement Repair Contractors for Horry County Department of Airports
Results
Conway, SC 29526

Roadway Improvements Champions Boulevard
Results
Less than $162,830 est. value
North Myrtle Beach, SC

Road Improvements - Fall 2019
Results
Less than $1,140,471 est. value
North Myrtle Beach, SC

Roadway Resurfacing
Results
Surfside Beach, SC

Last Updated 01/04/2021 03:41 PM
Project Title

Remove/Replace Road Paving: North Myrtle Beach Air Traffic Control Tower

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall remove and replace the existing ATCT access road and dispose of the waste off site. The access road is to be cleaned and prep for a paved facility access road and paved parking lot by filling in all potholes with compacted spot asphalt, and by removing all vegetation and all loose sand and gravel. Apply a tack coat atop the entire base course of the AOA access road, atop the paved facility access road, and atop the paved parking lot. The parking lot is to have entire area restriped as per the drawing CRE-D-ATCT-C003.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents