Similar Projects
Emergency Final Costs JRTC Elevator Maintenance and Repair
Post-Bid
Less than $175,000 est. value
Chicago, IL 60601

Elevator Inspection and Plan Review Services
Post-Bid
Palatine, IL

UIC - Building 975 Elevator Upgrades (School Of Public Health)
Results
Chicago, IL 60612

Elevator Maintenance and Repair Services
Results
Oak Park, IL

Conveyance Maintenance Repair
Post-Bid
Chicago, IL

IVHC - FY21 - Elevator Maintenance and Repair Services
Results
Chicago, IL

Elevator Maintenance Services
Term Contract
Post-Bid
Schaumburg, IL

CPS Von Linne ES Replacement of Inclined Chair Lift
Results
Chicago, IL

Elevator Maintenance
Post-Bid
Arlington Heights, IL

CPS Lowell ES & Nobel ES Elevator Modernization
Renovation, Alteration
Results
$3,500,000 est. value
Chicago, IL 60651

Elevators, ADA Lifts, Chair Lifts, and Portable Pool Lifts: Maintenance and Repair
Post-Bid
Chicago, IL

CPS Carl Von Linne ES Inclined Chair Lift
Alteration
Results
Chicago, IL 60618

Argonne Bldg 362 Elevator Modifications
Post-Bid
Lemont, IL 60439

Elevator Services
Post-Bid
$25,000 est. value
Chicago, IL

EHRM Training and Admin Space Support Phase 1
Post-Bid
Hines, IL 60141

Last Updated 04/14/2022 02:25 PM
Project Title

Harold Washington SSA Elevator Upgrades

Physical Address View project details and contacts
City, State (County) Chicago, IL 60661   (Cook County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to the following: Repair passenger elevator equipment, upgrade 12 passenger elevators with new, state of the art, energy efficient, non-proprietary, microprocessor-based controllers and drives, refurbishment of governors, buffers and pit equipment for each elevator, and realignment of any misaligned guide rails, the fire command panel will be replaced and incorporated with the emergency power operation panel along with the fire alarm monitoring and management system, guarded LED lighting will be added in pits and shafts, all abandoned equipment will be removed in machine rooms, the contractor is to provide all the management, supervision, manpower, equipment and supplies necessary for this project.

Details

Division 14 - Conveying Equipment, Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents