Similar Projects
Last Updated | 01/11/2021 08:48 AM |
Project Title | Water System High Zone Extension along Marion Drive |
Physical Address | View project details and contacts |
City, State (County) | Kingston, MA (Plymouth County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 |
Plans Available from | Engineer - 11/11/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DCAMM Certification Required. The project consists of installing a 16-inch diameter ductile iron water main along Marion Drive from the eastern-most point of Country Club Way to Gallen Road, then along Gallen Road for approximately 200 feet to a proposed pressure reducing valve vault. Total length of water main to be installed is approximately 2,700 linear feet and includes a crossing of the MBTA right-of-way (and Silver Line tracks) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |