Similar Projects
Locust Street Solar
New Construction, Infrastructure
Conception
$500,000 est. value
Freetown, MA

RFP Design - Planning and Design Study for McArthur Drive Redevelopment Area
New Construction, Infrastructure
Conception
$230,000 CJ est. value
New Bedford, MA 02740

New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Fairhaven High School Alumni Stadium Restroom Support Building
Infrastructure
Design
$1,049,000 CJ est. value
Fairhaven, MA 02719

Cleaning, Painting, and Structural Repairs to Two (2) Bridges (Nos. N-16-050 and N-16-053) on a Section of I-295
Infrastructure
Bidding
$2,092,050 CJ est. value
North Attleboro, MA 02760

Intersection Improvements and Related Work (Including Signals) Acushnet Avenue at Peckham Road and Sassaquin Avenue
Infrastructure
Bidding
$1,565,361 CJ est. value
New Bedford, MA 02745

WWTF Headworks HVAC System Improvements - Sub Bid
Renovation, Infrastructure
Sub-Bidding
$50,000 CJ est. value
North Attleboro, MA 02763

Site Improvements Chor Bishop
Infrastructure
Post-Bid
Fall River, MA

RFP D/B - Corridor Improvements on Route 79 and Davol Street
Infrastructure
Post-Bid
$108,719,547 CJ est. value
Fall River, MA 02720

Bottom of CAD Cell No. 4 and North Terminal Expansion Project
Results
Less than $22,000,000 est. value
New Bedford, MA

Briggs Street Culvert Replacement
Results
$320,000 est. value
Dighton, MA 02715

45 Braley Road Solar
New Construction
Pending Verification
Freetown, MA 02717

Turnpike Street Warehouse and Office
Demolition, New Construction, Infrastructure - 101,200 SF
Pending Verification
$20,000,000 CJ est. value
South Easton, MA 02375

Fuel Tank Removal
Infrastructure
Bidding
$280,000 CJ est. value
South Easton, MA 02375

East Campus Dorm Demolition
Demolition, Infrastructure
Post-Bid
$14,000,000 est. value
Dartmouth, MA 02747

Last Updated 08/08/2022 12:34 AM
Project Title

RCP Culvert

Physical Address View project details and contacts
City, State (County) Taunton, MA 02780   (Bristol County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $478,750 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A portion of the existing 42" RCP culvert that connects wetlands is proposed to be replaced: with a 42" RCP culvert shifted south to accommodate future construction of a new school building. The proposed project removes approximately 440' of the existing 42" RCP culvert. The proposed relocated culvert will be approximately 492' +- long. The proposed work will also include all demolition required for the removal and relocation of the existing 42" RCP culvert and associated structures. Estimated Cost $450,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents