Similar Projects
Millwork, Framing and Drywall On-Call Single Trade Services
Post-Bid
Denver, CO 80202

ACC DQ 20-3-920 Feature Wall
Post-Bid
Denver, CO

Door Replacements - Dunn Elementary School
Results
Fort Collins, CO

Interior Finish Work at FAA's Denver ARTCC's Childcare Facility Located in Longmont, CO
Results
$250,000 to $500,000 est. value
Longmont, CO

Protective Coatings
Post-Bid
CO

Soundproofing of 2nd Floor
Results
Grand Junction, CO 81501

Bvcc Twc Partition Cubicles
Post-Bid
Buena Vista, CO

Waterproofing of Windows and Building Perimeter
Results
Littleton, CO 80120

Flooring Services
Post-Bid
Westminster, CO

Broomfield Flooring and Drywall Replacement Project
Results
Broomfield, CO 80020

Berthoud Headquarters Wall Covering Project
Post-Bid
Berthoud, CO 80513

As-Needed Painting and Drywall Services
Term Contract
Results
Aspen, Carbondale, Glenwood Springs, Parachute, Snowmass, CO

HPER - Massari Arena Divider Curtains - Phase 1
Post-Bid
Pueblo, CO 81001

Acoustical Paneling for Central Recreation Center
Results
$75,000 to $90,000 est. value
Aurora, CO

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

Last Updated 10/16/2020 11:04 AM
Project Title

Annual Maintenance - Resurface/ Refinishing Repairs

Physical Address View project details and contacts
City, State (County) Loveland, Milliken, Windsor, CO 80538 (Larimer, Weld Counties)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Surface repairs on counters, cabinet tops, bathtubs, shower enclosures as needed for all properties owned and/or managed by the Loveland Housing Authority (LHA). Provide surface patching and/or refinishing of counter/cabinet tops, cabinets, plumbing fixtures as may be requested. These prices include all labor, material and equipment costs as may be required to complete the Work, as well as a one (1) year warranty on all material and labor. Patching of up to three (3) 1-inch diameter holes is to be included in refinishing costs and/or patching only costs for porcelain finishes and three (3) 3-inch diameter holes for fiberglass and/or high pressure laminate finishes. Site Visit Locations 8/18/2020 8:00 AM- 10:00 AM- Rock Crest Apartments: 4905 Lucerne Ave 10:00 AM-12:00 PM- Administration Building: 375 W. 37th Ave 1:00 PM- 3:00PM- Orchard Place Apartments: 197 Elder Dr 8/19/2020 8:00 AM- 10:00 AM- Willow Place Apartments: 2669 North Monroe Ave 10:00 AM- 12:00 PM- Silver Leaf Apartments I and II: 2000 Maple Dr 1:00 PM- 3:00 PM- Meadows Apartments: 1056 Lynx Ave 8/20/2020 8:00 AM-10:00 AM- Art Space Apartments: 140 W. 3rd St 10:00 AM-12:00 PM- Mirasol Community: Phase I, II, Event Center- 1152 Finch Pl 1:00 PM-3:00 PM- Mirasol Community: Phase III, HOA, And Town homes- 1152 Finch Pl 8/25/2020 8:00 AM-10:00 AM- Art Space Apartments: 140 W. 3rd St 10:00 AM-12:00 PM- Mirasol Community: Phase I, II, Event Center- 1152 Finch Pl 1:00 PM-3:00 PM- Mirasol Community: Phase III, HOA, And Town homes- 1152 Finch Pl 8/26/2020 8:00 AM-10:00 AM- Windsor Meadows I and II: 1500 Tipton Dr. WINDSOR 10:00 AM-12:00 PM- Century III: 1027 Walnut St, WINDSOR 1:00 PM-3:00 PM- Dove Valley: Lark Bunting Lane, MILLIKEN

Details

Division 09 - Finishes.
Division 12 - Furnishings, Bath Furnishings.
Division 22 - Plumbing, Operation and Maintenance of Plumbing, Operation and Maintenance of Plumbing Fixtures.
Division 41 - Material Processing and Handling Equipment, Storage Equipment and Systems, Storage Cabinets.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents