Similar Projects
Moderate Risk Waste Facility (MRWF) Retrofit
New Construction
Bidding
Kennewick, WA 99336

Wastewater Treatment Facility Operations Building Restoration
Renovation
Bidding
$1,500,000 est. value
Bridgeport, WA

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

WWTP Digester 4
New Construction
Bidding
Wenatchee, WA

Interbay Forcemain and Odor Control Project
Renovation
Post-Bid
$1,100,000 est. value
WA

Post Point Sludge Pump System Replacement
Renovation, Addition
Bidding
$1,100,000 to $1,500,000 est. value
Bellingham, WA 98225

Biosolids Dewatering and Lift Station Improvement
Renovation
Bidding
Twisp, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Bidding
$15,000,000 est. value
Seattle, WA

WWTP Improvements Phase I - Major Equipment
New Construction
Post-Bid
Stevenson, WA

Reported 10/21/2021 12:00 AM
Project Title

Civil Structural Construction Work Order 2021-2022

Physical Address View project details and contacts
City, State (County) Seattle, WA   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes furnishing all labor, tools, equipment, materials, incidentals, superintendents, subcontractor coordination and overhead to perform various civil and structural repairs, replacement, minor modifications and safety improvements in the Wastewater Treatment Division. The work requires principally civil/structural and related trades. Associated subcontractors may be required.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents