Last Updated 07/07/2022 03:20 AM
Project Title

Water Treatment Plant Modifications - General Construction, Electrical Construction and Mechanical Construction

Physical Address View project details and contacts
City, State (County) Stevens, PA 17578   (Lancaster County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Mechanical, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In summary, the project consists of limited instrumentation, new cleaning tank, and minor piping modifications, as well as limited electrical work, a new emergency backup generator, and a dehumidification system at the existing water treatment facility. Contract No. 1- General Construction: The scope consists of coordination of other contracts, supplying and installation of: a new NF cleaning tank with tank heater, valves and concrete pad, antiscalant piping, plant piping and valves modifications, new control valves, dehumidification systems pads, trenching for conduits, generator pad, generator platform and stairs and all other miscellaneous specified work not covered by contracts 2 and 3. Contract No. 2- Electrical Construction: The scope consists of supplying and installation of emergency generator, modifications to existing panels and ATS, supply and installation of: paddle fans, pressure transmitters, flow meters, NF cleaning tank heater wiring and disconnect and wiring of plant instruments, furnishing electrical and control wiring for dehumidification systems, all other specified/shown electrical and control wiring for the entire project. All specified control devices shall also be included in this contract. Contract No. 3- Mechanical Construction: The project consists of supplying and installation of dehumidification equipment and duct work.

Details

Water Treatment Plant, Renovation.
Division 03 - Concrete.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Humidity Control Equipment, Desiccant Dehumidification Units.
Division 25 - Integrated Automation, Integrated Automation Instrumentation and Terminal Devices for HVAC, Integrated Automation Sensors and Transmitters.
Division 26 - Electrical, Common Work Results for Electrical, Wiring Connections, Packaged Generator Assemblies.
Division 40 - Process Integration, Schedules for Process Integration, Schedules for Liquids Process Piping, Steam Process Piping, Water Process Piping, Primary Control Devices, Primary Control Valves.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Operation and Maintenance of Process Gas and Liquid Handling, Purification, and Storage Equipment, Operation and Maintenance of Gas and Liquid Storage, Pressurized Tanks Cleaning, Maintenance, and Rehabilitation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents