Similar Projects
Senator Roth (SR-1) Bridge Repair
Renovation
Design
$10,000,000 to $25,000,000 est. value
Middletown, DE 19709

SR 1 Corridor Phase One Deck Sealing, NCC, FY 21
Results
DE

Structure Rehabilitation, Canal District, Open End, FY21-FY23
Results
Less than $3,972,060 est. value
DE

BR 3-162 on S466 Delaware Ave Over Broad Creek
Results
DE

White Clay Creek Bike/Ped Bridge
Results
Newark, DE

BR 1-421 on Maryland Line Road Over Tributary to Sassafras River
Results
DE

BR 1-022 and BR 1-525 on Sharpley Road
Results
Wilmington, DE 19803

Brandywine River Raceway Bridge Reconstruction
Results
Wilmington, DE

Structure Maintenance, Open End, South, FY22-FY24
Infrastructure
Results
DE

St. Georges Substructure Bridge Repair
Renovation
Results
$1,000,000 to $5,000,000 est. value
Saint Georges, DE 19733

Rehabilitation of Bridges 1-242, 1-362, and 1-406
New Construction, Infrastructure
Results
DE

Polyester Polymer Concrete Deck Overlay William V. Roth, Jr. Bridge
Renovation, Infrastructure
Results
$10,000,000 to $25,000,000 est. value
Middletown, Saint Georges, DE 19709

Rehabilitation of BR 1-635 on SR 2 Over Red Clay Creek
New Construction, Infrastructure
Results
DE

Bridge Replacements, Kent County
New Construction, Infrastructure
Results
DE

HEP Sussex County, SR1 and SR16 Grade Separated Intersection
New Construction, Infrastructure
Results
DE

Last Updated 05/10/2022 08:02 AM
Project Title

Movable Bridge Preventative Maintenance, South, FY 22-26

Physical Address View project details and contacts
City, State (County) (Kent, Sussex Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements consist of furnishing all labor and materials for implementing preventative maintenance measures on movable bridges in South District. This work consists of providing all materials and labor (include all Key Staff specified within this Common Special Provision) necessary to perform preventative maintenance (also referred to as cyclical maintenance) of the mechanical and electrical components and general housekeeping of the control house and piers. This maintenance work will be performed at the 5 DelDOT South District movable bridges, located in Kent County and Sussex County, Delaware. Expected and required submittals for the bridge maintenance work includes (but are not limited to) maintenance schedule, safety procedures, material catalog cut sheets, and completed Maintenance Checklists

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents