Similar Projects
BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Edinger Pump Station Replacement
Renovation
Bidding
Orange, CA

Lakeside Valve Station Replacement
Renovation
Bidding
$2,200,000 to $2,500,000 est. value
San Diego, CA

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Bridalveil Fall Comfort Station & Water Supply
New Construction
Post-Bid
Yosemite Lakes, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Lift Station 80-03 Upgrade Project
Renovation
Bidding
$690,000 est. value
Palm Desert, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Ford and Orchard Lift Station Replacement
Renovation
Bidding
$300,000 est. value
Ukiah, CA 95482

Parker Pump Station Replacement
New Construction, Demolition
Post-Bid
$17,400,000 to $19,400,000 est. value
Coronado, CA

Boathouse Lift Station Replacement Project
Renovation
Results
$300,000 est. value
Fremont, CA 94538

Sears Point Pump Station Rehabilitation Project
Renovation
Bidding
$3,530,000 est. value
Vallejo, CA 94590

Seawater Sand Filter Installation
New Construction
Post-Bid
Santa Cruz, CA 95060

Last Updated 05/12/2022 12:40 AM
Project Title

Corte Madera Creek Flood Risk Management Project Phase 1 Access Ramp and Granton Park Pump Station

Physical Address View project details and contacts
City, State (County) CA   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project improvements will include construction of a new storm water pump station, and a new concrete vehicular maintenance access ramp up to the existing concrete channel wall of Corte Madera Creek within a residential neighborhood of Kentfield. The work will take place within an easement area upon College of Marin property, and on District owned land.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents