Similar Projects
Barrow Transportation Facility Update
Renovation
Conception
$1,600,000 est. value
Frisco, TX 75033

Frisco ISD Additional Transportation Facility
New Construction
Conception
$19,200,000 est. value
Frisco, TX

McKinney Educational Facility Construction
New Construction
Design
$38,500,000 est. value
Frisco, TX

Melissa High School Phase 3
New Construction - 227,000 SF
Design
Melissa, TX

Farmersville HS Multi-Purpose
Addition
Sub-Bidding
Farmersville, TX

Plano ISD - T H Williams High School Renovations
Renovation - 81,400 SF
Post-Bid
Less than $14,000,000 est. value
Plano, TX 75074

General Services
Term Contract
Post-Bid
Allen, TX 75002

Concession Stand with Restrooms at the Bland High School Sports Facility
Results
Farmersville, TX 75442

Design/Build for a New Field House for the Blue Ridge Independent School District
New Construction
Results
Blue Ridge, TX

Frisco High School #12
Construction
Frisco, TX 75035

Anna ISD – Multi-Purpose Facility
New Construction
Construction
Dallas, TX

McKinney Boyd STEM, CTE & Fine Arts Expansion
Addition
Conception
$8,000,000 est. value
McKinney, TX 75071

JV Clark Triple Fields Locker Room
Post-Bid
Less than $350,000 est. value
Plano, TX 75023

Disaster Recovery Services
Results

Prosper High School #3
New Construction
Construction
Prosper, TX

Reported 01/10/2022 04:11 PM
Project Title

Burnett Junior High and Cooper Intermediate School

Physical Address View project details and contacts
City, State (County) Wylie, TX   (Collin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced November 2021
Bids Due View project details and contacts
Estimated Value $5,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Burnett: An addition and renovations to the existing Junior High School. The addition provides a new Ensemble room and associated site components. The interior renovation includes structural modifications to the existing black box room to increase the volume, new finishes and a new pipe grid and theatrical lighting. Associated site and utility work will be required to accommodate the new addition. Cooper: An addition and renovations to the existing Junior High School. The addition includes a new Band Hall and vestibule. The renovation includes Choir, Ensemble, practice rooms, associated offices, and storage. Associated site and utility work will be required to accommodate the new addition. Cooper Junior High - $1,900,000. Burnett Junior High - $3,700,000.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents