Similar Projects
YTECH Mixed Use
New Construction, Build-Out - 432,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL 33129

Orion Sixto
New Construction - 5,692 SF
Conception
Doral, FL 33166

Norman Brothers Produce Redevelopment
New Construction, Build-Out - 121,540 SF
Design
$10,000,000 CJ est. value
Miami, FL

Murphy Express #8980
New Construction - 2,800 SF
Design
Miami, FL 33106

Publix #1804 - Shell
New Construction, Build-Out - 132,000 SF
Bidding
$1,100,000 est. value
Hialeah, FL

Aldi #71 -Coconut Grove
Build-Out - 18,405 SF
Bidding
Miami, FL 33133

7-Eleven #41703
New Construction - 2,940 SF
Post-Bid
$1,200,000 est. value
Miami, FL 33142

7-Eleven #41703
New Construction - 2,940 SF
Post-Bid
$1,200,000 est. value
Miami, FL 33142

Publix #1770
New Construction, Demolition - 47,000 SF
Construction
$10,000,000 est. value
Coral Gables, FL

7-Eleven #30025
New Construction, Renovation - 2,000 SF
Construction
$2,000,000 est. value
South Miami, FL 33155

Target
New Construction - 77,471 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33010

Murphy Express #8999
New Construction
Conception
Medley, FL 33178

Whole Foods - Build Out
New Construction - 40,000 SF
Design
$5,000,000 to $10,000,000 est. value
Miami, FL 33137

Murphy USA #6507
New Construction, Demolition - 1,400 SF
Post-Bid
Less than $500,000 CJ est. value
Hialeah Gardens, FL 33016

Murphy Express #8882
New Construction - 2,433 SF
Construction
North Miami Beach, FL 33162

Reported 02/21/2022 09:40 AM
Project Title

Wawa #5358

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33018   (Miami-Dade County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method
Project Status Building in Operation as of fourth quarter 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Gas Station, New Construction, Supermarket/Convenience Store, 6,827 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents