Similar Projects
Patapsco Centrate Treatment Facilities - 551-150 - City of Baltimore
Renovation
Conception
$54,473,000 CJ est. value
Baltimore, MD 21226

WC-1416 East Madison Street and Vicinity Water Main Replacement - 557-243 - City of Baltimore
Infrastructure
Conception
$4,210,000 CJ est. value
Baltimore, MD 21205

Primrose School / Annapolis
New Construction, Infrastructure - 12,405 SF
Design
$3,000,000 CJ est. value
Annapolis, MD 21403

Monterey Avenue Sidewalk - H569600 - Anne Arundel County
Infrastructure
Design
$3,089,000 CJ est. value
Annapolis, MD 21401

AutoZone #6782 / Odenton
New Construction, Infrastructure - 6,446 SF
Post-Bid
$250,000 CJ est. value
Odenton, MD 21113

Unaccompanied Enlisted Personnel Housing (UEPH) Barracks Replacement at Fort Meade, Maryland
Demolition, New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Fort Meade, MD 20755

Maryland City Water Reclamation Facility (WRF) Utility Water Pump Replacement
Renovation
Results
$618,525 CJ est. value
Laurel, MD 20724

Cox Creek WRF Grit System Improvements
Renovation
Results
$4,526,000 est. value
Annapolis, MD

Erect Statue in Maryland State House
New Construction, Infrastructure
Construction
$200,000 CJ est. value
Annapolis, MD 21401

RFQ D/B - Howard Street Tunnel Project
New Construction, Infrastructure
Construction
$466,000,000 CJ est. value
Baltimore, MD 21217

Park Place Hotel
New Construction, Infrastructure - 76,985 SF
Pending Verification
$33,000,000 CJ est. value
Annapolis, MD 21401

Energy Parkway Warehouse
New Construction, Infrastructure - 188,000 SF
Pending Verification
$20,000,000 CJ est. value
District 3, MD 21226

Patapsco Low Lift Pump Station Rehabilitation - 551-059 - City of Baltimore
Renovation
Conception
$16,146,000 CJ est. value
Baltimore, MD 21226

Crofton Meadows II Expansion - Phase II - W801400 - Anne Arundel County
Addition, Infrastructure
Design
$61,194,000 CJ est. value
Crofton, MD 21114

HC Properties Phase I - Plan A and Plan B
Build-out, Infrastructure - 94,412 SF
Post-Bid
$10,000,000 CJ est. value
Baltimore, MD 21230

Last Updated 06/21/2023 04:34 AM
Project Title

Dorsey Water Treatment Plant (WTP) Emergency Generator and Switchgear Replacement

Physical Address View project details and contacts
City, State (County) Glen Burnie, MD 21061   (Anne Arundel County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,945,420 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new utility service with utility transformer for the new switchboard MDS-1 located inside walk-in enclosure provided by switchboard manufacturer. Work includes ATS and MTS installed inside walk-in enclosure and a pad mounted exterior generator for standby power for the water treatment plant. Underground ductbank work and traffic coordination for operations and other County officials to have access to site and parking for vehicles. Salvage of existing medium voltage gear, transformers, and low voltage gear is by the Contractor and shall be coordinated with BGE utility for removal of existing services after new service and equipment is fully operational. The cost range for the Project is: $3,000,000 to $3,500,000

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents