Similar Projects
WWTP Backwash Pump
Infrastructure
Bidding
Novi, MI 48377

WWTP Clarifiers Rehabilitation
Post-Bid
Marshall, MI 49068

Raw Water Pump Station Strainer Hoist Placement
Post-Bid
Algonac, MI 48001

YCUA Incinerator Improvements
Results
Ypsilanti, MI

Wastewater Treatment Plant Drying Beds
Results
Less than $897,400 est. value
Lansing, MI

WWTP Clarifiers Rehabilitation, Contract 2, Construction and Installation
Post-Bid
Marshall, MI 49068

Design-Build Contract for CSO Facilities Structural Improvements
Results
Detroit, MI

Marquette Area Wastewater Treatment Facility Biosolids Improvement Project
New Construction
Post-Bid
Less than $5,000,000 est. value
Marquette, MI

WWTP Headworks Screen Improvements
Results
Less than $409,461 est. value
Holly, MI

Water and Wastewater Treatment On-Call Construction Services
New Construction
Post-Bid
Saline, MI

Waste Water Treatment Plant UV and Chemical Improvements
Results
Mount Pleasant, MI

Lagoon Transfer Valve Repair Services
Renovation
Post-Bid
Allegan, MI

Camp Grayling - Replace/Modernize WWTF Discharge System
Results
Less than $2,819,469 est. value
Grayling, MI

CWSRF Project Battery B Grit and Primary Settling Tanks
Renovation
Post-Bid
Flint, MI

WWTP Grit System Improvements
Results
Port Huron, MI

Last Updated 08/26/2021 02:59 PM
Project Title

Aspen Meadows Well House Improvements

Physical Address View project details and contacts
City, State (County) White Lake, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes Constructing improvements to the existing Aspen Meadows Wellhouse to include Construction of a biological water treatment plant for iron removal consisting of two (2) 10 foot diameter vertical pressure filters, two (2) air scour blowers, post filtration disinfection chemical system and phosphate chemical system, new instrumentation, SCADA system expansion, backwash holding tank with air mix and gravity drain to new back wash pump station, and approximately 8,000 feet of 4 inch HDPE FM with connection to existing sanitary sewer.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents