Similar Projects
Traffic Calming Enhancements Along Hall Blvd., Temple Blvd. and 140Th Avenue
Infrastructure
Bidding
$839,543 est. value
FL

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Gateway Boulevard and Military Trail Intersection Improvements
Post-Bid
$1,360,000 est. value
West Palm Beach, FL 33472

Safety D/B Push Button for WWD Devices at Interstate Ramps
Results

Annual Small Concrete and Pathway Construction Contract
Term Contract
Results
Less than $1,350,000 est. value
FL

Amazon Delivery Station - DFH6
Build-Out, Infrastructure - 120,282 SF
Construction
Riviera Beach, FL 33404

Installation of an ADA Compliant Aluminum Railing and Retention Wall at the North Access of Lantana Beach
Infrastructure
Post-Bid
$120,000 est. value
Lantana, FL

Pelican Preserve Nature Walk Repair Project
Results
Palm Beach Gardens, FL

Corbett (Boardwalk Phase II)
Infrastructure
Post-Bid
$900,000 est. value
West Palm Beach, FL 33412

Construction of Hood Road from Briar Lake Drive to West of Florida`s Turnpike
Results
Less than $360,000 est. value
Palm Beach, FL

Lighting
Results
Less than $3,096,713 est. value
Palm Beach, FL 33480

Furnish and Install Flexi-Pave or Approved Equal
Results
Delray Beach, FL 33445

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Results
$650,000 est. value
Jupiter, FL

Public Works Annual Pathways and Minor Construction
Term Contract
Results
Wellington, FL

Belvedere Heights Phase 1, Sidewalks and Pedestrian Lights
Infrastructure
Results
$183,991 est. value
West Palm Beach, FL

Last Updated 05/18/2022 02:10 PM
Project Title

Northmore Elementary Sidewalks

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33407   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,202,454
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project proposes the construction of sidewalks, replacement of existing damaged sidewalk, milling and resurfacing and restriping. Also, sections of swale will need to be regraded to achieve positive flow and clearing and grubbing as necessary. These improvements will provide accessibility and maneuverability, not only for those with disabilities but also for all residents and visitors.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents