Similar Projects
Surfside Crossing
New Construction
Conception
Nantucket, MA 02554

North Pearl Street Development
New Construction, Demolition
Conception
Brockton, MA

Birch Street Place
New Construction - 205,990 SF
Design
$10,000,000 CJ est. value
Milford, MA 01757

South Yarmouth Wise Living Retirement Community
New Construction, Renovation - 54,400 SF
Design
$5,000,000 est. value
South Yarmouth, MA 02664

Pool Balance Tank and System Repairs
Post-Bid
Brookline, MA 02445

Pool Maintenance Services
Term Contract
Post-Bid
Weston, MA

Paris Street Pool Renovations - General Bids
Results
East Boston, MA 02108

Pool Start-up Procedures
Results
Less than $30,000 est. value
Needham, MA 02492

Langwood Commons
New Construction - 350,000 SF
Construction
$50,000,000 to $60,000,000 est. value
Stoneham, MA

Echelon Seaport
New Construction - 1,025,000 SF
Construction
$900,000,000 est. value
Boston, MA

Volaris Marlborough
New Construction
Design
Marlborough, MA

Re-Grout and Replace Dislodged Tiles in the Swim Lanes
Post-Bid
Less than $22,000 est. value
Ludlow, MA

Construction Manager (CM) at Risk Services for Forest River Pool and Bathhouse
Results
Less than $10,200,000 est. value
Salem, MA

Cambria Hotel
New Construction - 98,851 SF
Construction
$35,000,000 est. value
Somerville, MA

Hathaway Apartment Complex
New Construction - 65,225 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dartmouth, MA 02747

Reported 12/19/2019 12:00 AM
Project Title

Mccrehan and Holland Wadding Pool to Spray Deck Construction

Physical Address View project details and contacts
City, State (County) Cambridge, MA   (Middlesex County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the complete demolition of existing wading pools at the two facilities and the construction of new spray decks to replace the wading pools. The project includes new concrete spray deck surfaces overlain by a resilient soft surface, new spray features and controllers, water supply piping and drain connections, site grading, and site amenities. Legacy environmentally impacted construction materials have also been identified at both locations and must be appropriately managed under this contract. Both projects will be included under this single contract and the construction of the two projects will occur at the same time. It is expected that a work plan be finalized, and demolition of existing wading pools/excavation started this winter with temperature affective work to be completed in the spring.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents