Similar Projects
Wisconsin State Fair Park Gate 5 Safety Reconfiguration
Renovation
Conception
$400,000 est. value
Milwaukee, WI 53214

Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

Mechanical Demolition
Demolition
Post-Bid
Milwaukee, WI 53206

2022 Green Infrastructure Upgrades BP 1
Renovation, Infrastructure
Post-Bid
$317,000 to $553,000 est. value
Milwaukee, WI 53206

Wilson Park Creek Reach 3 Phase 1 - Detention Basin
Infrastructure
Results
Milwaukee, WI

Burnham Canal Wetland Base
Infrastructure
Results
Milwaukee, WI

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

Cornerstone Village Wauwatosa
New Construction, Infrastructure - 9,796 SF
Design
$31,000,000 CJ est. value
Wauwatosa, WI 53213

Owners Representative - 2022 Milwaukee Recreation Facility Projects
Renovation, Infrastructure
Post-Bid
Milwaukee, WI

Last Updated 04/07/2023 07:34 AM
Project Title

Jackson Park - W40009 - Milwaukee Metropolitan Sewerage District

Physical Address View project details and contacts
City, State (County) West Milwaukee, WI 53215   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2026
Bids Due View project details and contacts
Estimated Value $41,647,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to reduce flood risk on the KK River as well as mitigate increased flood flows from proposed recommendations for the KK River (W40002), Lyons Park Creek (W41001), and the S. 43rd Street Ditch (W42003) projects. Over 350 residential and commercial structures are in the one percent annual probability floodplain within the project areas. The project's purpose also improves public safety and aquatic and riparian habitat conditions. The project scope consists of lowering Milwaukee County land in Jackson Park to create 150 acre-feet of flood storage, incorporating improvements and/or additional park assets to compensate the County for the park area and assets impacted as part of this project, and replacing the concrete channel lining (1,400 feet) and enclosed culverts (700 feet) with a naturalized channel within Jackson Park. The project scope also includes the acquisition and removal of structures from properties located at 2425 S. 35th Street (formerly owned by We Energies) and 3460 W. Leeds Place (formerly owned by Dion-Simon Investments). The District will utilize these properties to provide flood storage to offset flood storage needed in Jackson Park. The change in total project cost is primarily due to adding the scope of work for acquiring and removing structures from the two additional properties outside of Jackson Park. The impacts to the operating budget will be determined following the development of future intergovernmental cooperation agreements between the District and Milwaukee County for ongoing site maintenance. The project is included in the 2022-2027 Capital Improvement Program (CIP). *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents