Similar Projects
Last Updated | 04/07/2023 10:34 AM |
Project Title | US 20: Chestnut St to Imperial Parkway |
Physical Address | View project details and contacts |
City, State (County) | Girard, PA 16417 (Erie County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,693,771 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is the construction of approximately 1.651 miles from SR 0020/Segment 0240/Offset 1332 to SR 0020/Segment 0280/Offset 2289, including milling existing asphalt pavement, flexible base replacement, overlay with Superpave Asphalt Mixtures, minor drainage, traffic signals, signing, pavement markings, and ADA concrete sidewalk as indicated on the approved drawings included in the Bid Package. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays 408 Version: 2020-5 PennDOT - US 20: Chestnut St to Imperial Parkway *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |