Similar Projects
86 & 82 Sheppard Street Parking Lot
New Construction
Design
Charleston, SC

South Pinckney Street Parking Lot
Post-Bid
Union, SC

McCall Farms, Inc North Parking Lot Expansion 2018
Post-Bid
$315,000 est. value
Effingham, SC

Sidewalk Package S6
Results
SC

Holly Hill Pedestrian Improvements US 176, MP 16.85 - MP 17.17
Results
SC

Woodruff Streetscape
Post-Bid
$400,000 to $425,000 est. value
Woodruff, SC

Tap Sidewalk Installation
Results
SC

Streetscape Improvements Phase 1
Post-Bid
McCormick, SC

Concrete Walkway and Stairs
Results
$14,250 est. value
Duncan, SC

Generations Park Walking Trail
Post-Bid
Aiken, SC

Resurface and Restripe the Parking Lot Area
Results
$26,320 est. value
York, SC 29745

Garco and Empire Streetscape Plan
Post-Bid
North Charleston, SC

Spartanburg - TRB 94 Warehouse Parking Lot Repair
Results
$90,000 to $130,000 est. value
Duncan, SC

Viking Greenway Phase 2
Post-Bid
$70,000 to $85,000 est. value
Latta, SC

1st Avenue North Parking Lot Upgrade
Results
Surfside Beach, SC

Reported 12/21/2018 12:00 AM
Project Title

Denmark Streetscape Extension

Physical Address View project details and contacts
City, State (County) Denmark, SC   (Bamberg County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description Work will include but will not necessarily be limited to: A. Mill and overlay existing street and restripe new lane configuration. Demolish and replace curb and gutter. Provide new planting bed bump outs. B. Demolish existing concrete sidewalk and replace with approximate 10' wide concrete sidewalk with brick borders and sandblasted accents. Furnish and install site furniture and seating areas along corridor. C. Planting and irrigation of new landscape areas. D. Coordinate with SCE and G for removal of existing lights and installation of new conduit and street lights by SCE and G.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents