Similar Projects
Parking Lot Renovations
Infrastructure
Results
$1,798,000 CJ est. value
Dover, DE 19904

MATOC - Concrete Repair and Asphalt Paving
Term Contract, Alteration
Post-Bid
$100,000 to $250,000 est. value
New Castle, DE 19720

Carvel State Office Building - Concrete Landing and Steps
Alteration
Results
Wilmington, DE 19801

Precast Enclosures
Alteration
Post-Bid
Wilmington, DE

Parking Lot and Perimeter Road Rehabilitation
Infrastructure
Results
$181,035 CJ est. value
New Castle, DE 19720

Long Line Pavement Markings, Statewide
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Middletown, DE 19709

Council Chamber Hybrid Meeting Platform Upgrade
Renovation
Post-Bid
$475,000 CJ est. value
Newark, DE 19711

Last Updated 04/05/2023 07:03 AM
Project Title

Subdivision Paving, North II, 2023

Physical Address View project details and contacts
City, State (County) Middletown, DE 19709   (New Castle County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,187,859 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This item shall govern the Quality Assurance Testing for supplying bituminous asphalt plant materials and constructing bituminous asphalt pavements and the calculation for incentives and disincentives for materials and construction. The Engineer will evaluate all materials and construction for acceptance. The procedures for acceptance are described in this Section. Include the costs for all materials, labor, equipment, tools, and incidentals necessary to meet the requirements of this specification in the bid price per ton for the bituminous asphalt. Payment to the Contractor for the bituminous asphalt item(s) will be based on the Contract price per ton and the pay adjustments described in this specification. The improvements consist of furnishing all labor and materials for work to include curb and gutter, sidewalk repairs, and/or Bituminous Concrete milling and overlay. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. LOCATION: New Castle County These improvements are more specifically shown on the Location Map(s) of the attached Plans. COMPLETION TIME: All work on this contract must be complete within 607 Calendar Days. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. It is estimated a Notice to Proceed is issued such that work starts on or about April 24, 2023. QUESTIONS: E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. DelDot - Subdivision Paving, North II, 2023

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents