Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

HVAC and Mechanical Products
Term Contract
Post-Bid

2021 HVAC Upgrades at Antioch Community HS
Post-Bid
Lake Villa, IL

2021 HVAC Upgrades Diamond Lake School
Results
Mundelein, IL

Roofing Replacement on the Sheppard Middle School
Results
Deerfield, IL

Standing Seam Metal Roofing
Post-Bid
Highwood, IL 60040

Steep Slope Roofing Replacement on the Oak Terrace Elementary School
Results
Highwood, IL 60040

Replace Roofing System
Post-Bid
$1,500,000 est. value
Grayslake, IL 60030

Leisure Center HVAC Roof-Top Unit
Results
Zion, IL 60099

2021 Coated Foamed Roofing Work
Post-Bid
North Chicago, IL 60064

Mechanical HVAC System Replacement
Results
Wauconda, IL 60084

2021 Rooftop Unit Replacement
Post-Bid
Antioch, IL 60002

Public Services Roof Repair
Results
Highland Park, IL 60035

2021 Roof Replacement at Antioch & Lakes Community HS
Post-Bid
Antioch, Lake Villa, IL 60002

Station 2 HVAC
Alteration
Results
Vernon Hills, IL 60061

Last Updated 06/15/2022 11:35 PM
Project Title

Sheriff Community Based Corrections Center (CBCC) and Adult Detention Center Tower Roof Replacements

Physical Address View project details and contacts
City, State (County) Waukegan, IL   (Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Sheriff Community Based Corrections Center (CBCC) building needs a full roof replacement as well as concrete crack repair. Most existing drains, vents, and equipment are to remain. Installation of a new roof hatch and ladder for access to the Roof #02 is also needed. Removed equipment is to be inspected and protected from the elements until reinstalled by the contractor. Adult Detention Center needs a full roof replacement as well as concrete crack repair. Drains, vents, and HVAC equipment are to remain. Roof hatch to Roof # 01 is to be replaced along with the removal of two stairwell pressure relief hoods and dampers. Any HVAC equipment that needs to be removed and reinstalled shall be protected from the elements until reinstalled by the contractor. Roofs #02 and #03 to have the old davits mounting bases to be removed and the concrete anchor holes repaired.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents