Similar Projects
Request for Proposals to Interested Qualified Companies to Install a New Chiller
Bidding
Tuskegee, AL 36088

Substation U Bushing
Term Contract
Bidding
Opelika, AL

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Z--Project 619-17-102 Replace AHU Building 1
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36109

MA - Maintenance Service of HVAC Equipment
Term Contract
Results
Montgomery, AL

Ductile Iron Utility Poles
Bidding
Opelika, AL

Research Center Electrical Modifications
Post-Bid
Hunter, AL

Oak Mountain High School Plumbing & HVAC Systems Renovations
Results
Columbiana, AL

Switch and Transformers - Utilities and Energy
Post-Bid
Auburn, AL

Maintenance of UPS Systems
Term Contract
Results
Opelika, AL 36801

Transformer - Utilities & Energy
Post-Bid
Auburn, AL

Building Chiller Renovation
Results
Less than $553,200 est. value
Montgomery, AL

MA-ALDOT Statewide HVAC
Term Contract
Post-Bid

MA-Electrical Repair and Maintenance Products
Results

Reported 05/25/2019 12:00 AM
Project Title

Weatherization Assistance Program (WAP)

Physical Address View project details and contacts
City, State (County) (Autauga, Chilton, Dallas, Elmore, Lee, Macon, Montgomery, Perry, Russell, Shelby Counties)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Blower Door Air Tightness System and use said equipment on every unit to reach targeted air flow rates and conduct proper pressure testing. A good quality infrared camera will be needed to check for voids in the installed insulation negating call backs. Gas fitters, Electrical, HVAC and Plumbing subcontractor licenses and insurances will also be required (WAP only).
Details
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents