Similar Projects
Manvel Town Center Water Plant
Bidding
Houston, TX

Renovations to Water Plant No. 1
Renovation
Bidding
New Caney, TX 77357

Pearland Surface Water Plant
Post-Bid
Less than $100,000,000 est. value
Pearland, TX 77853

Skid Based Reverse Osmosis System for the WTP Phase 1 Improvements Parker County SUD
Post-Bid
Weatherford, TX

Z--Wastewater Treatment Plant (WWTP) Repair Project, Naval Air Station (NAS) Corpus Christi, TX.
Results
$25,000,000 to $40,000,000 est. value
Corpus Christi, TX 78418

Modifications to Water Plant No 1
Results
Less than $2,100,000 est. value
TX

Radium Reduction CMAR Project
Post-Bid
Less than $25,000,000 est. value
Brady, TX 76825

Lake Lewisville Water Treatment Plant Phase II Improvements
Results
$15,588,880 est. value
Denton, TX 76205

Surface Water Plant
Post-Bid
Pearland, TX 77581

Water Treatment Plant Improvements- Rebid
Results
$2,400,000 to $2,600,000 est. value
Canyon, TX 79015

Deer Run Meadows Water Plant
Post-Bid
Richmond, TX 77406

Wastewater Treatment Plant Nos. 1 and 2 Improvements
Results
TX

Northeast Water Purification Plant Expansion Project
Post-Bid
TX 77396

Water Reclamation Plant Odor Control System
Term Contract
Results
Lake Dallas, TX 75065

Water Plant No. 1 Expansion No. 2
Post-Bid
TX

Reported 12/14/2019 12:00 AM
Project Title

H--CTX Boiler Plant Water Treatment 674-20-1-5066-0002

Physical Address View project details and contacts
City, State (County) Temple, TX 76504   (Bell County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

emple and Waco Boiler Plant Water Treatment Contract Contractor shall provide services at the Temple VA Medical Center, 1901 South 1st Street, Temple, TX 76504 and the Waco VA Medical Center, 4800 Memorial Drive, Waco, TX 76711. Normal duty hours are 0800-1600 Monday through Friday and all deliveries should be scheduled for these times. Boiler plant operator s work 24/7 and can accept deliveries on other than normal duty tours when scheduled in advance. Vendor will contact the Boiler Plant Supervisors, Tim Pittman, at 254- 743-1559 or his designee prior to delivery of any products. Contractor will deliver Temple Boiler Plant chemicals to Building 58 during the hours listed above. Contractor will have a representative on site when deliveries are conducted. Contractor will deliver Waco Boiler Plant chemicals to Building 225 during the hours listed above. Contractor will have a representative on site when deliveries are conducted. At both sites Contractor will transfer chemicals as they are delivered and immediately remove empty containers. Contractor shall provide all chemicals necessary for both boiler plants for the entire period of the contact. This shall include: A boiler compound for control of alkalinity, phosphates and polymer/dispersants. A sulfite compound for control of oxygen A neutralizing amine for condensate treatment Any other recommended treatment chemical This chemical treatment program must ensure the maximum benefit to prolong the life of the boilers and protection of the steam and condensate systems. Contractor shall provide enough chemical to treat at a minimum: Temple; 129,000,000 pounds of steam per year and 1,500,000 gallons of makeup water and in Waco; 93,000,000 pounds of steam 9,000,000 gallons of makeup waters as well as the ability under the terms of the contract to continue treatment that may be in excess of these amounts. Contractor will maintain a minimum of 55 gallons of each boiler/system treatment chemical in the contractor provided chemical storage and injection tanks. Chemical Water Treatment Supplies and Services Introduction: The chemical water treatment contractors shall provide all supplies and technical advisory services for chemical treatment of boiler plant water and steam to achieve specified results. VMAC boiler plant employees will be responsible for continuous feeding of chemicals and performing water tests with oversight by the contractor. In addition, the contractor shall periodically verify the proper operation of non-chemical water treatment systems which serve the boiler plan including: feedwater deaerator, water softeners, and continuous blowdown. The goals are safety, reliability and longevity of the steam and condensate piping and equipment in the boiler plant, in the steam distribution system and in the various buildings of the VA facility. Chemical Water Treatment Contractor Qualifications: The contractor shall have been in business at least five years providing chemical treatment of boiler plant and steam distribution systems similar in design and annual steam production rates to that of the VA facility. Provide a list of at least five customers similar to the VA who have utilized the services for boiler chemical treatment for at least three years. One water treatment specialist who has a bachelor s degree in chemical engineering or the physical sciences from an accredited college or university shall be assign to this contract. The water treatment specialist must have at least five years successful experience with boiler water treatment programs and shall furnish references from at least three customers who utilize boiler water treatment programs. The water treatment specialist assigned must be located within 100 miles of the site to enable reasonable response times to request for site visits. The contractor must operate (or continuously maintain a contract with) a state certified laboratory to perform complete scientific analyses of water chemistry, deposits, metallic materials affected by corrosion and provide recommendations for correction of problems related to chemical and mechanical water treatment program. A Professional Chemist shall supervise the laboratory. Chemicals and Testing Supplies: Provide all chemicals, test kits, test reagents, corrosion coupons and instructional materials as necessary to comply with all contract requirements. Deliver to the boiler plant supervisor or boiler operator on duty. Chelant-based chemicals are not permitted. All chemicals utilized must conform to FDA guidelines: CFR 21, 173.310, BOILER WATER ADDITIVES PERMITTED IN PLANTS WHERE STEAM CONTACTS FOOD. In addition, the chemicals shall conform to all local, state and federal government regulations on water pollution and have appropriate EPA registration. The VAMC utilizes boiler steam for food preparation and for humidification. Furnish on site chemical storage containers with secondary containment. Provide bulk delivery service which delivers the chemicals directly into the on-site storage containers with no assistance necessary from VA employees other than to provide access. All existing chemicals, which are suitable for contract program, will be utilized prior to the use of any new chemicals. Submit MSDS sheets for all chemicals utilized during the performance of services under this contract. The MSDS sheets will accompany delivery of the chemicals. All chemical containers shall be labeled with complete information on contents and shall be returnable. Containers with missing labels shall be removed from the site. All containers remain the property of the contractor and must be immediately removed from the site when they are no longer needed at the site. Performance Requirements: Total hardness in feedwater shall be less than one part per million (ppm). Advise VA personnel on proper softener monitoring and operation. Dissolved oxygen in the feedwater shall be 7 parts per billion (ppb) maximum with oxygen scavenger treatment temporarily suspended. If it exceeds 12 ppb, provide recommendation to boiler plant supervisor that deaerator must be inspected and repaired. Prevent embrittlement of boiler pressure vessels. Condition the boiler sludge to obtain effective bottom blow-off. Boiler Residual of sodium sulfite, 30-60 ppm. Boiler phosphate residual, 20-40 ppm. Total dissolved solids (TDS) in boilers as high as possible, but not to exceed 4000 ppm. Total alkalinity in boilers 800 ppm maximum (1/5 x solids TDS). Maximum suspended solids in boilers 350 ppm, maximum silica 250 ppm. Boiler polymer dispersant residual as recommended by supplier. There shall be no pitting corrosion. There shall be no scale and deposit formation in the boilers Moisture content of the steam shall not exceed one percent. Perform condensate conductivity tests at a steam trap near the boiler steam outlet (at a point with no amines) to evaluate the moisture content of the steam. If necessary, utilize an antifoam agent to limit solids carryover in the steam from the boilers and to control boiler priming, foaming and misting. Control boiler water chemistry to minimize blowdown and thus improve efficiency. Provide steam amine treatment to provide condensate pH of 8.0-8.5 at each condensate receiver throughout the facility and in the condensate storage tank in the boiler plant. Feed the amines into the boilers instead of the steam header in order to achieve even dispersal throughout the distribution system. Control corrosion rates. Steel corrosion rates shall be less than 2.0 mils per year. Copper corrosion rates shall be less than 0.2 mils per year. Establish a layer of magnetic iron oxide (black or dark gray in color) on all steel surfaces as a corrosion barrier. On-Site Services: Provide complete written instructions, supplemented by oral instructions and demonstrations, to boiler plant personnel for their performance of routine water tests for feeding the chemicals into the systems. The instructions shall cover all aspects of safe chemical handling and safe and accurate testing, and proper chemical feed quantities and methods to suit the plant operating parameters and water treatment performance requirements. Provide three two-hour training sessions within two months of the start of a new contract. The first session shall be within one week of the start of the contract. Provide one two-hour training session ever six months after the new contract has been enforced for six months. As a minimum, perform the following test monthly, provide complete written reports with all test results and recommendations, and review reports with plant supervisor: Condensate return systems: pH, hardness, dissolved iron and copper, total dissolved solids (conductivity), amine, condensate conductivity at a steam trap near the boiler steam outlet. Test the condensate for pH at representative samples of condensate receivers throughout the facility at least twice per year. Vary the sample sites ever year. Make-up water including soft water: pH, alkalinity, hardness, total dissolved solids, suspended solids and silica. Boiler feedwater: Dissolved oxygen, pH alkalinity, hardness, total dissolved solids, suspended solids, and silica. Feedwater dissolved oxygen shall be tested twice per year with oxygen scavenger chemical treatment temporarily suspended so that feedwater deaerator performance can be evaluated. Boiler water: Total dissolved solids, suspended solids, sulfite, phosphate, and alkalinity. Continuous blowdown systems: Check calibration and settings monthly. Chemical feed systems: Advise plant supervisor on adjustments to maintain proper chemical dosage and feed rates and blowdown rates. Visit the plant weekly during the first three months of a new contract. After three months, visit the plant monthly, perform tests listed above and review daily logs of tests performed by boiler plant personnel. Discuss the results with the plant supervisor. Provide recommendations on treatment methods and consult on boiler plant and steam and condensate distribution systems problems as requested. Send water samples to the laboratory as necessary to resolve problems and questions. Male additional visits at the request of the plant supervisor to handle problems. Conduct waterside inspection of boilers, feedwater, deaerator and condensate storage tank at least once per year. Through the Contracting Officer s Technical Representative (COTR), coordinate the boiler and feedwater deaerator inspection coincide with the inspection by the Qualified Professional Inspector (boiler inspector). VA personnel will prepare equipment for inspection. Provide recommendations on wet and dry boiler lay-up procedures, including monitoring, of boilers not in service. Provide recommendations on proper operation of the continuous boiler blowdown systems and boiler bottom blow-off procedures. Test corrosion coupons from condensate lines once per year and provide report. VA personnel will install, remove and deliver the coupons to the water treatment specialist. Any deficiencies of problems noted with VA Test results or with the water treatment specialist s test results are to be reported immediately, chemicals as necessary provided, and tests performed as necessary to confirm that desired results are achieved. Request for Quote (RFQ).

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents