Similar Projects
K-Life Of Hot Springs
New Construction, Infrastructure - 3,000 SF
Design
$981,000 CJ est. value
Hot Springs, AR 71913

Chick-fil-A / Hot Springs
Demolition, New Construction, Infrastructure - 5,150 SF
Design
$1,500,000 CJ est. value
Hot Springs, AR 71913

Repair Rock Wall, Whittington Creek
Infrastructure
Bidding
$1,000,000 CJ est. value
Hot Springs National Park, AR 71901

Phase 2 Thornton Ferry Road County Roadway Improvements
Infrastructure
Post-Bid
Hot Springs, AR

Property Clearing and Grubbing
Infrastructure
Post-Bid
Hot Springs, AR 71901

Mountain Pine Overlay No. 2
Infrastructure
Results
$437,334 est. value
Mountain Pine, AR

Road Maintenance Services
Term Contract
Results
Hot Springs, Russellville, AR 71902

Garland County Library Garden
New Construction, Infrastructure
Construction
$475,100 CJ est. value
Hot Springs National Park, AR 71901

Big Red Convenience Store / Hot Springs
New Construction, Infrastructure - 4,100 SF
Pending Verification
$1,000,000 CJ est. value
Hot Springs, AR 71913

Big Red Convenience Store / Hot Springs
New Construction, Infrastructure - 4,100 SF
Pending Verification
$1,000,000 CJ est. value
Hot Springs, AR 71913

Park Avenue Widening - Fox Pass Cutoff to Highway 5 and 7 - Arkansas Department of Transportation
Infrastructure
Design
$18,000,000 CJ est. value
Hot Springs National Park, AR 71901

High Performance Cold Mix
Infrastructure
Post-Bid

Hot Springs Lakeshore DR. Overlay (S)
Infrastructure
Results
$400,000 est. value
Hot Springs, AR 71913

Adcock Road Office Development
Demolition, New Construction, Infrastructure - 25,402 SF
Pending Verification
$5,000,000 CJ est. value
Hot Springs, AR 71913

Asphalt Surfacing Projects at the Bus Garage
Infrastructure
Post-Bid
$600,000 est. value
Pearcy, AR

Last Updated 07/19/2023 12:52 PM
Project Title

Finished Water Transmission Pipeline Contract D

Physical Address View project details and contacts
City, State (County) Hot Springs National Park, AR 71901   (Garland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,415,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of modifying bridge structure and approximately 600 LF of 24-inch Finished Water transmission main and appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents