Similar Projects
Water Meter Replacement
Infrastructure
Design
$83,850 CJ est. value
Porterdale, GA 30014

Plumbing Services for Dekalb Cares (Multi-year Contract - 2 Years)
Term Contract
Sub-Bidding
Decatur, GA 30030

Plumbing System for Cedar Shoals Modular Unit
Renovation
Sub-Bidding
$150,000 CJ est. value
Athens, GA 30605

Upper Dissolved Oxygen Erosion Repair
Infrastructure
Post-Bid
$1,997,573 CJ est. value
Rincon, GA 31326

Canal Road Widening Project (Re-Bid)
Infrastructure
Post-Bid
$7,358,110 CJ est. value
Brunswick, GA 31525

Unpaved Roads - Phase 1, Braeburn Drive, Hirsh Street
Infrastructure
Results
$2,398,839 CJ est. value
Atlanta, GA 30334

Major Building System Replacement - Multiple Schools
Term Contract
Results
Lithonia, Stonecrest, GA 30058

Cowan's Lake Raw Water Pump Station Improvements
Renovation
Pending Verification
$86,000 CJ est. value
Villa Rica, GA 30180

General Plumbing Services
Term Contract
Sub-Bidding
Atlanta, GA 30334

Alice Coachman Elementary - HVAC and Plumbing Upgrades
Alteration
Post-Bid
$1,400,000 est. value
Albany, GA 31721

Custom Sink
Alteration
Results
Decatur, GA 30033

International Studies Elementary - HVAC and Plumbing Upgrades
Alteration
Post-Bid
$1,300,000 est. value
Albany, GA 31705

Buford Southside Water Pollution Control Plant (WPCP) Filter Replacement
Renovation
Results
$1,087,352 CJ est. value
Buford, GA 30518

Grease Trap Pumping Service
Term Contract
Post-Bid
Blairsville, GA

North Clayton Control Valve
Infrastructure, Alteration
Results
$150,000 est. value
Clayton, GA

Last Updated 10/11/2023 12:10 PM
Project Title

Five Forks Phase 1 - Flowers Crossing Neighborhood Water Main Replacements

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30044   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $3,999,780 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Gwinnett County Department of Water Resources requests the replacement of approximately 12,900 linear feet (LF) of the existing 8" PVC water main with a new 8" DIP water main in the Flowers Crossing Subdivision. Question Deadline 09/20/2023 at 3:00 PM ET Liquidated Damages: Bidder agrees to complete the Contract awarded within the "allowable calendar days for completion" from the date of the "Notice to Proceed" and he further agrees that the Owner may retain from the monies which may become due the amount of $1,000.00 (Substantial) / $1,000.00 (Final) for each and every day that the completion of the work may be delayed. All Bidders are required to submit a Bid Bond or a certified check made payable to the Gwinnett County Board of Commissioners in the amount of five percent (5%) of the total amount bid. The Bid Bond or certified check must be enclosed in the envelope with the sealed bid. The successful bidder will be required to furnish a contract Performance Bond and Payment Bond, each in the sum of 100% of the total amount bid and provide insurance coverage as required by the contract documents. The County will award the Contract to the lowest "qualified" bidder, subject with the Owner's right to reject any or all bids, to waive technicalities, and to make an award deemed in its best interests. With limited response, Gwinnett County reserves the right to extend the solicitation opening date as appropriate in order to assure a competitive procurement process.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents