Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

PC Air Units
Post-Bid
Charlotte, NC 28208

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - HVAC System
Results
Cullowhee, NC 28723

Chiller Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Chancellor's Residence HVAC Renovation
Results
Chapel Hill, NC 27514

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

30-35 Ton Chill Water Unit Rental
Post-Bid
Atlantic Beach, NC 28512

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Durham City Hall HVAC and Electrical Renovations
Post-Bid
Durham, NC

Install 20 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

Reported 04/02/2021 12:00 AM
Project Title

Union West Regional Library Ceiling

Physical Address View project details and contacts
City, State (County) Indian Trail, NC 28079   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Make HVAC modifications as shown on the attached Mechanical plan. Remove 14 x 10 grill and attach a 14 x 10 duct to the existing 14 x 10 duct. Each takeoff from the new 14 x 10, galvanized sheet metal duct shall have a manual volume damper. All ducts shall have 1” fiberglass duct wrap with vinyl covering. The duct shall be mounted such that it is not visible in the main library area. (As close to the new lay-in ceiling as possible.) Any required supports connecting to the existing wooden arch shall be neat in appearance, as approved by Union County and as small as possible. The diffusers shall be perforated, lay-in with the neck size to match the runouts shown on the sketch. (3 New Diffusers). 2. Add 24” x 48” light fixtures with LED lighting as shown on the attached sketch. The lights shall be LED and shall be powered from the fixtures above the arch. Any conduit or connections shall be neat, plumb and painted to match the adjacent walls. These new lights shall be switched by the same switch that controls the existing lights. (3 New Fixtures). 3. The lay-in ceiling shall be installed just above the existing side wall light fixtures. The required grid support shall be transparent and neatly attached with connectors suitable to be exposed to the existing wooden arch. 4. Coordinate the additions of all trades closely. The goal of this project scope is to make any added components related to HVAC, Lighting, or Ceiling not visible or very neat in appearance.

Details

Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents