Similar Projects
Dell Range/Rue Terre Intersection - EN-14-008 - City of Cheyenne
Infrastructure
Conception
$4,000,000 CJ est. value
Cheyenne, WY 82009

RFQ Engineering - Professional Engineer Services for Phase 1 Environmental Site Assessments
Infrastructure
Conception
$300,000 CJ est. value
Cheyenne, WY 82001

Western Hills Drainage - EN-14-029 - City of Cheyenne
Infrastructure
Design
$1,000,000 CJ est. value
Cheyenne, WY 82009

RFP D/B - Repair Base Perimeter Fence
Infrastructure
Design
$500,000 CJ est. value
Cheyenne, WY 82001

Central Mail Drainage and Parking Lot project
Infrastructure
Bidding
$300,000 CJ est. value
Cheyenne, WY 82001

Wyoming State Parks and Cultural Resources Crow Creek Trail Rehabilitation
Infrastructure
Bidding
$400,000 CJ est. value
Cheyenne, WY 82009

Regrading and Resurfacing Project
Infrastructure
Post-Bid
$359,000 CJ est. value
Cheyenne, WY 82001

Storm Water Pond Sediment Removal and Liner Replacement Project
Infrastructure
Post-Bid
$226,600 CJ est. value
Cheyenne, WY 82001

Sun Valley Pressure Zone Expansion Project
Infrastructure
Results
$1,080,500 CJ est. value
Cheyenne, WY 82001

Storey Boulevard and Ridge Road Signalized Intersection
Infrastructure
Construction
$480,000 CJ est. value
Cheyenne, WY 82001

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

Downtown Development Authority District Improvements - City Of Cheyenne
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Cheyenne, WY 82001

Johnson Pool Replacement - AQ-14-004 - City Of Cheyenne
Demolition, New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Cheyenne, WY 82007

Pine Bluffs to Nebraska East / US 30
Infrastructure
Design
$2,206,000 CJ est. value
Cheyenne, WY 82007

Destination Wayfinding Signage Plan, Phase IV Fabrication and Installation Services
Infrastructure
Bidding
$20,000 CJ est. value
Cheyenne, WY 82001

Last Updated 03/16/2023 11:04 AM
Project Title

North City Improvements - North City Tank

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $6,996,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a 6-million-gallon potable water storage tank with appurtenances, foundation, steel transmission line nozzles, overflow discharge vaults, minor site improvement and restoration work, and modifications to an existing welded steel water storage tank. The BOPU will accept bids for a potable water storage tank meeting the requirements of the most recent version of either American Water Works Association (AWWA) Standard D100 Welded Carbon Steel Tanks for Water Storage -OR- AWWA Standard D110 Wire- and Strand-Wound, Circular, Prestressed Concrete Water Tanks. Each bid must be accompanied by a bid bond with sufficient surety for not less than five percent (5%) of the total amount of such bid, payable to, and to be forfeited to, the Cheyenne Board of Public Utilities as liquidated damages if bidder fails to enter into contract within thirty (30) days after award to him, or fails, at the time of executing the agreement, to furnish a performance bond and a payment bond each in the amount of one hundred percent (100%) of the bid. Facsimile (fax) or other copies of bonds are not acceptable, nor are certified cashier's checks, certified checks or bank drafts. NO BIDS WILL BE CONSIDERED IF NOT ACCOMPANIED BY SUCH BOND OR IF NOT IN CONFORMANCE WITH THE PROVISIONS OF W.S. 15-1-113. Pursuant to W.S. 16-6-106, "preference is hereby given to materials, supplies, agricultural products, equipment, machinery and provisions produced, manufactured or grown in Wyoming, or supplied by a resident of the state, quality being equal to articles offered by competitors outside of the state." Qualified Disadvantaged Business Enterprises (DBEs) are encouraged to submit bids on this project. Bidders that use a subcontractor(s)/supplier(s) are required to make a good faith effort at soliciting DBE subcontractor/supplier participation. Bidders shall submit the required DBE Good Faith Effort Documentation form and other related forms with their bids. Qualified Disadvantaged Business Enterprises (DBEs) are encouraged to submit bids on this project. Bidders that use a subcontractor(s)/supplier(s) are required to make a good faith effort at soliciting DBE subcontractor/supplier participation. Bidders shall submit the required DBE Good Faith Effort Documentation form and other related forms with their bids. The procurement will be subject to the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, The Consolidated Appropriations Act, 2014 and as updated and revised in America's Water Infrastructure Act of 2018. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. The Issuing Office for the Bidding Documents is: Board of Public Utilities. The date that the Bidding Documents are obtained by the Bidder will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Original CADD and WORD files will not be distributed. MBE (7.5%), WBE (6.9%) The Work will be substantially completed on or before September 1, 2024 ; final completion- on or before October 1, 2024.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents