Last Updated | 02/02/2023 11:31 AM |
Project Title | Waunakee Community School District Fall 2022 Referendum |
Physical Address | View project details and contacts |
City, State (County) | Waunakee, WI 53597 (Dane County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $73,900,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New Heritage Elementary (on Intermediate Site) Plans call for the construction of an approximately 140,000 square foot building directly east of the intermediate school. Construction could begin as early as 2023. New Middle School (Heritage Site) Plans call for construction of a two-story, 238,000 square foot middle school at 501 South Street. The first option would result in a two-story building with parking for 175-200 vehicles at the south end of the site, as well as a full-size football field and 300-meter track behind to the east. The school would open in fall 2026. New Middle School (Heritage Site) Plans call for the construction of a three-story, 238,000 square foot middle school. The second option would result in a three-story building with parking for 150-175 vehicles at the west end of the site, an 80-yard football field at the north end, and a 300-meter track to the east. The school would open in 2025. As of January 9, 2023, the site plan for the Elementary School is under review. The design team presented conceptual plans for a new Heritage Elementary and two options for the District's new middle school. The referendum was approved and design can commence. Design for the elementary school begin in July 2022 with construction to begin in April 2023. Design for the Middle School began in November 2022. Option 1 would begin construction in October 2023, while Option 2 would not begin construction until July 2024. An architect and Construction Manager have been selected. |
||||||||||||||||||||||||||||||||||||||
Details | 378,000 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |