Similar Projects
Generator Load Bank Maintenance
Term Contract
Design
Hines, IL 60141

150KVA 208.120 Three Phase Pad Mount Transformer
Alteration
Bidding
Winnetka, IL

Single Phase Overhead Pole Mount Transformer
Alteration
Bidding
Winnetka, IL

Lighting Replacement at Rolling Meadows Library
Post-Bid
Rolling Meadows, IL 60008

Boiler 1 And 3 At Dusable High School
Post-Bid
Chicago, IL 60615

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

Switch Gear Reconditioning & Preventative Maintenance
Results
IL 60141

100KVA 240.120 Single Phase Pad-Mount Transformer
Alteration
Bidding
Winnetka, IL

LED Light Emitting Diode Fixtures
Post-Bid
Arlington Heights, IL 60005

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Installation of 138 KV to 12.47 KV Substation Transformer
Alteration
Bidding
Winnetka, IL

Electrical Fittings, Condut and Electrical Supplies
Post-Bid
Less than $2,003,467 est. value
Chicago, IL

Chiller Compressor Replacement at Explorers ES
Results
Chicago, IL 60632

DDC Upgrades for AHU and Zones Armour ES
Post-Bid
Chicago, IL 60616

Berwyn Police Department Fire Pump Controller Replacement
Results
Berwyn, IL 60402

Last Updated 01/19/2022 02:56 PM
Project Title

Harper College - Building V Greenhouse Heat

Physical Address View project details and contacts
City, State (County) Palatine, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes (but is not limited to) the following: 1. The installation of a new gas fired heaters. 2. The installation of a new natural gas standby generator. 3. The installation of a new generator distribution panel and transfer switch. 4. The installation of a new heat trace cabling and insulation on piping. 5. The installation of new power receptacles. 6. The relocation of fire alarm devices. 7. The construction of insulated enclosures. 8. Miscellaneous piping and power distribution. 9. Integration of these systems into the BAS system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents