Similar Projects
Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
Infrastructure
Conception
$325,000 CJ est. value
East Lansing, MI 48823

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

Meridian Company Industrial Building
New Construction, Infrastructure - 31,355 SF
Design
$16,000,000 CJ est. value
East Lansing, MI 48823

Rehabilitation of Steam Manholes MH905 and MH910
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

Montgomery Drain Maintenance and Improvement Project Division XII - Ranney Park, Phase II
Infrastructure
Bidding
$2,000,000 CJ est. value
Lansing, MI 48912

Ingham ISD Wilson Talent Center - Bid Package 4
Addition, Renovation, Infrastructure - 6,000 SF
Sub-Bidding
$13,500,000 CJ est. value
Mason, MI 48854

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

Sexton Site Work
Infrastructure
Post-Bid
Lansing, MI 48915

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

Fiberglass Building for WWTP
New Construction
Results
Lansing, MI

Neogen Shiawassee Street Manufacturing Plant
New Construction, Infrastructure - 175,000 SF
Pending Verification
$70,000,000 CJ est. value
Lansing, MI 48912

Former Sears Building Redevelopment / Lansing
Demolition, New Construction, Infrastructure - 196,000 SF
Pending Verification
$51,000,000 CJ est. value
Lansing, MI 48912

International Center - Renew/Replace Drain Piping System - Office - Michigan State University
Renovation, Infrastructure
Conception
$650,000 CJ est. value
East Lansing, MI 48824

City View Lansing Apartments
New Construction, Infrastructure - 3,500 SF
Design
$25,000,000 CJ est. value
Lansing, MI 48933

Last Updated 12/09/2022 02:15 PM
Project Title

RFP - Water Treatment Plant Ground Storage Reservoir

Physical Address View project details and contacts
City, State (County) East Lansing, MI 48823   (Ingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Proposal (RFP) is to select a firm to provide Professional Engineering Services for the Design, Specifications, Bidding and Construction Administration services for the addition of a 2.0 MG Ground Storage Reservoir and associated piping systems and connections for the East Lansing - Meridian Water and Sewer Authority (Authority) Drinking Water Treatment Plant. See additional detail in the attached RFP document. General Requirements - Insurance Required - Local Service Required - Prevailing Wage Required - Employee Background Checks Required - Federally Funded - Certified Payroll Question Acceptance Deadline 04/21/2022 05:00 PM EDT Questions are submitted online No The method of Contractor Selection has not been Determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents