Similar Projects
Z2da--Upgrade Water Distribution Legionella Prevention Project # 590-18-103 Hampton VA Medical Center
Term Contract
Design
$2,000,000 to $5,000,000 est. value
Hampton, VA 23667

Payne Well Pump Replacement
Infrastructure
Design
$130,000 CJ est. value
King George, VA 22485

York River System Isolation Valve Installation and Replacement
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Hampton, VA 23669

Commercial Plumbing Fixtures and Accessories
Term Contract
Sub-Bidding
Richmond, VA 23219

Plumbing Supplies
Term Contract
Post-Bid
Hampton, VA

Curbio 5518
Post-Bid
Alexandria, VA 22312

Plumbing Services
Term Contract
Results

Plumbing Services
Term Contract
Results

Plumbing Equipment Grab Bars - Furnish and Deliver Only
Post-Bid
State Farm, VA

Specialized Plumbing Services
Results
$200,000 to $299,999 est. value
Arlington, VA

Branch's Baptist Stormwater Retrofit
Post-Bid
Richmond, VA 23224

Citywide Plumbing Services
Results
Less than $50,000 est. value
Norfolk, VA

Burlington #1158
Renovation
Post-Bid
Vienna, VA 22182

21-Des-Itb-594 Plumbing Repair Services
Results
VA

Rivers Casino Portsmouth Mep Design Assist Package Only
Term Contract
Post-Bid
Portsmouth, VA 23708

Last Updated 08/17/2022 12:33 AM
Project Title

Pocahontas Correctional Center Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Bluefield, VA 24605   (Tazewell County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as replacement of four (4) housing unit hot water heaters at Pocahontas Correctional Center. 1. Scope of Work: a. Bidders are required to include a detailed written proposal in the bid submittal. Proposal must list the brand name and model number of equipment. If bidding equivalent, Bidder must provide detailed specifications of equipment for evaluation by Agency. b. Prevailing Wages apply to contracts for projects funded in whole or in part by state funds, valued at $250,000 or more. The website for additional information is - https://www.doli.virginia.gov/prevailing-wage-law/ c. Time For Completion: The Work shall commenced 30 calendar days after receipt of order and shall be Substantially Completed within 30 calendar days. The Work shall be finally completed within 7 days after the date of Substantial Completion of the Work. If a delay in receipt of equipment prevents this deadline, documentation from the manufacturer must be provided. d. It is the responsibility of the Contractor to attend the pre-bid conference to observe existing conditions and evaluate adjustments needed. e. Contractor will not be allowed to bring truck inside the secure perimeter. Agency will transport all materials inside to work site for Contractor and will remove materials from work site. f. Agency requires at least one water heater in the Building to be operational within 72-hours once Contractor takes the heaters out of service, Contractor shall provide a backup system to ensure hot water is available to the building if this 72-hour requirement cannot be met. g. Work shall include compete furnish and install. The work shall consist of providing all materials, equipment, tools, and incidentals necessary to furnish, deliver, and install equipment. h. Work shall include removal of old equipment. Agency will dispose of all old equipment and materials.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents