Similar Projects
CSN West Charleston Building G Fume Hood Installation
Alteration
Bidding
$100,000 est. value
Las Vegas, NV 89146

Fume Hood
Post-Bid
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

J045--Chiller Comprehensive Service and Maintenance
Results

J045--Chiller Comprehensive Service and Maintenance
Results

NV Ang Building 9 Chiller Replacement
Post-Bid
Reno, NV 89502

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

HVAC Air Filter Replacement Service
Alteration
Post-Bid
NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

45--Supply and Replace HVAC Units
Results
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

90 Ton High Ambient Air-Cooled Chiller
Alteration
Post-Bid
Las Vegas, NV 89106

Welding Lab Vent - West Wendover High School
Results
West Wendover, NV 89883

Last Updated 10/13/2021 10:51 AM
Project Title

Tonopah Field Office HVAC Replacement - BMDO

Physical Address View project details and contacts
City, State (County) Tonopah, NV 89049   (Nye County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to; provide all labor, site visits, consultants, support services for the design of the replacement of the Building 15 AHU’s and Chillers located in Building #15. Building 15 was designed in 1975 and constructed in 1978 and much of the HVAC components are original including the air handling units. The AHU that feeds the Basement and First floor (CLC) are 43 years old and need a full upgrade and replacement (including controls). The AHU’s have one fresh air intake and share other functions as well, these AHU’s need to be 100% separate from each other. A/E shall design to the latest HVAC Design manual as well as ASHRAE and CLC HVAC requirements. The three (3) 50-ton chillers are almost 15 years old and shall be replaced under this design. AE to determine the size of the new chillers as well as the quantity. It is assumed all supply and return piping (zones) would remain. Included in the design of the work will be the demolishing of the existing mechanical systems, `phasing for construction, as well as temporary AHU’s to support Building 15 basement and CLC.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents