Similar Projects
RFQ Engineering - Professional Architectural and/or Engineering Services for Feasibility and Design of the Evergreen Woods Subdivision Wastewater
Infrastructure
Conception
$352,000 CJ est. value
Houston, TX 77002

City Hall Annex - Replace Sanitary Line - D-000215 - City of Houston
Infrastructure
Conception
$1,144,000 est. value
Houston, TX 77002

Disaster Heavy Civil Construction and Related Items
Term Contract
Design
Houston, TX 77002

Veranda / Section 32, 41, Section 4 Park
Infrastructure
Design
$461,000 est. value
Houston, TX 77025

Construction of The Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Bridgeland Creekland Village Drive Phase 2
Infrastructure
Bidding
$2,000,000 CJ est. value
Houston, TX 77002

Detention to Serve Bradbury Forest Sections 11 - 14 within Harris County Municipal Utility District No. 82
Infrastructure
Bidding
$350,000 CJ est. value
Houston, TX 77002

Airport Ground Access Survey Services
Term Contract
Sub-Bidding
Houston, TX 77002

Operations and Maintenance (O and M) of Central Utility Plant (CUP) for Houston Airport System (HAS) - H73
Term Contract
Sub-Bidding
Humble, TX 77338

Fan Coil Cleaning Services
Post-Bid
Aldine, TX

Imperial Forest Section 5
Post-Bid
Houston, TX

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Huntington Village Section 4 - City of Houston
Infrastructure - 4,600,000 SF
Pending Verification
$13,400,000 CJ est. value
Houston, TX 77099

Fuel Tank Replacement - North Shepherd - F-000908 - City of Houston
Infrastructure
Conception
$253,000 est. value
Houston, TX 77018

HPW - Water Line Replacement in Neartown/Montrose
Infrastructure
Design
$300,000 est. value
Houston, TX

Last Updated 08/04/2022 09:37 AM
Project Title

Replacement and Repairs to Outfalls and Related Items at Various Locations

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $15,049,252 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement and Repairs to Outfalls and Related Items at Various Locations for the Harris County Office of the County Engineer. Questions Due Date: Apr 15th 2022, 12:00 PM CDT Replacement and Repairs to Outfalls and Related Items at Various Locations for the Harris County Office of the County Engineer (For one (1) year beginning approximately June 1, 2022) - UPIN 23035MF2KJ01 The intention of this Harris County Competitive Sealed Proposal (CSP) is to solicit offers for the replacement and repairs to outfalls and related items for the Harris County Office of the County Engineerin for one (1) year beginning approximately June 1, 2022. It is the responsibility of each vendor to examine the entire CSP package, seek clarification in writing, and review their response for accuracy before submitting. Questions relating to the CSP must be submitted in writing online within Bonfire at portal. The deadline for submission of questions relating to this CSP is listed on the Events Schedule within Bonfire. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be released as a Public Notice to all firms through Bonfire. The County will not be bound by any information conveyed verbally. Harris County may consider four (4) one-year renewal options, renewable one (1) year at a time, based on the same terms and conditions with future pricing for labor only revised according to the attachment for CPI-W Based Price Adjustment Calculations. Renewal is subject to approval by Harris County Commissioners Court. Once renewal options are exhausted, the contract must be rebid. Harris County reserves the right to rebid at any time as is in its best interest and is not automatically bound to renew. Texas law requires all parties who enter into any contract with the Harris County Hospital District which must be approved by its Board of Trustees to disclose all interested parties. Form 1295 must be completed in its entirety portal prior to submitting your response. Failure to do so may result in disqualification of your response. This project consists of the vendor furnishing all personnel, labor, materials, equipment and incidentals necessary for the replacement and repairs to outfalls and related items at various locations throughout Harris County. The rates quoted on the BidTable must be all-inclusive. "All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents