Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

Paved Town Trail Phase III
Infrastructure
Post-Bid
Brian Head, UT

Center Street Tree Grate Installation and Sidewalk Repair Project - 2022
Infrastructure
Post-Bid
Cedar City, UT

SR -14 Woods Ranch EB Passing Lane
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

SR-289; SUU Loop
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

Asphalt Street Crack Seal Chip Seal Asphalt Oil Applicator Crack Sealant Chip Seal Oil Materials
Infrastructure
Post-Bid
Cedar City, UT

I-15; South Cedar To North Cedar
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

Storm Drain Improvements Project - Center Street Concrete Inlet and Outlet Structures 2022
Infrastructure
Post-Bid
$400,000 CJ est. value
Cedar City, UT 84720

DFCM Construction-Standard Low Bid-Old Iron Towns Site
Infrastructure
Results
$160,000 est. value
Cedar City, UT 84720

On-Call Task Order Soft-Surface Trail System Maintenance and Related Services
Term Contract
Post-Bid
$177,256 est. value
Cedar City, UT

DFCM Construction-Pre-Qualified Paving and Site/Civil-SUU Auditorium Parking Lot Improvements
Infrastructure
Results
$84,000 est. value
Cedar City, UT 84720

Lund Highway Widening U-56 to 1600 North
Infrastructure
Post-Bid
$300,000 est. value
Cedar City, UT 84721

Last Updated 04/27/2023 05:17 PM
Project Title

Southwest Technical College a&t Building Sidewalk Paving and Waterway

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $196,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

See Project Description on page 4 for contact information and list of pre-qualified contractors. QUESTIONS DEADLINE Friday, April 21, 2023 3:00 PM SCOPE This section of the specifications cover specific requirements, instructions, and conditions applicable to this project only, which are not covered by the General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee. Should there be conflicting statements between this section and other sections of these specifications, this section shall govern. Should there be conflicting statements between the Standard General Conditions of the Construction Contract, these specifications or the Utah Division of Facilities Construction and Management (DFCM) Contractors Agreement. The order of precedence is as follows: 1. DFCM Contractors Agreement. 2. These Specifications 3. Standard General Conditions of the Construction Contract. The following documents are required before a certificate of occupancy is issued: o A code inspection report recommending that a certificate of occupancy be issued. o Final report from the special inspection agency. o Certificate of fire clearance from the State Fire Marshall. o Final approval from the State Elevator inspector, if applicable. N/A o Final approval from the State boiler inspector, if applicable. N/A o Report of the disinfection of the potable water system. IPC 610 N/A o A Certificate of Compliance from the approved fabricator, if applicable. IBC 1074.2.2 N/A o A stamped and signed final report from the structural engineer when structural observation is required by IBC 1710. N/A o An NFRC Certificate for fenestration without the NFRC label. N/A o Final report from the special inspector and the mechanical engineer when smoke control is required. The reports must comply with IBC 909.18.8.3. N/A

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents