Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Dan McCormack / Roofed Heavy Use Area and Manure Stacking Building
New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Loganton, PA 17747

Interstate 80 MM 190 WB
Infrastructure
Bidding
$2,500,000 CJ est. value
Renovo, PA 17764

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Road Repairs
Infrastructure
Post-Bid
Flemington, PA 17745

Group 2-22-ST1
Infrastructure
Results
$5,000,000 to $7,499,999 est. value

23NC Bull Run Road Project
Infrastructure
Results
Loganton, PA

Snook Road Bridge Rehabilitation Project
Infrastructure
Construction
$193,080 CJ est. value
Greene Township, PA 17747

Snook Road Bridge Rehabilitation Project
Infrastructure
Construction
$193,080 CJ est. value
Greene Township, PA 17747

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Last Updated 05/01/2023 04:37 PM
Project Title

2023 Road Seal Coat Project

Physical Address View project details and contacts
City, State (County) Woodward Township, PA 17745   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $182,357 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 1, 2023, project was awarded to Russell Standard, awarded amount is $184,989.78.** Roadway chip seal course work: Lebo. N. Sheetz, Miller, Cherry, Oak Ridge, and Powells Ridge Roads. Bidders will be required to provide bid security in the amount of 10% of the proposal. A bank check or bid bond will be accepted. Employees shall not be discriminated against because of race, color, age, religion, sex, or national origin. All proposals must be upon the form furnished by the Township. Wayne Township reserves the right to reject any and all bids. LOCATION OF WORK: Lebo Road -.72 mile, N. Sheetz Road-.86 mile, Miller Road-1.54 miles, Cherry Road-.07 mile, Oak Rigde Road-.43 mile, Powells Ridge Road-.36 mile. Optional: Union Church Road-.52 mile

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents