Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Moxy Hotel by Marriott / Saint Louis
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Saint Louis, MO 63101

Olive West Residential
New Construction, Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Saint Louis, MO 63108

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

North Jefferson Ave / Parnell Corridor Project
Infrastructure
Results
$27,700,735 to $247,000,734 est. value
Saint Louis, MO 63106

Cervantes Convention Center Expansion and Modernization Project 1
Addition, Demolition, Renovation, Infrastructure
Construction
$123,867,709 CJ est. value
Saint Louis, MO 63101

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Tower Grove Park - City of St. Louis
Infrastructure
Conception
$2,886,599 CJ est. value
Saint Louis, MO 63110

Preservation Square Phase 4
Demolition, New Construction, Infrastructure, Renovation
Design
$10,000,000 CJ est. value
Saint Louis, MO 63106

District-Wide Asphalt Repair
Term Contract
Post-Bid
Saint Louis, MO 63103

Last Updated 08/22/2023 02:17 PM
Project Title

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63107   (Saint Louis City County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $711,651,970 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 24, 2023, the project has not been awarded. A timeline for award has not been confirmed. The U.S. Army Corps of Engineers (USACE) Kansas City District intends to issue a 100% Small Business Set-Aside Design-Bid-Build solicitation for a single Firm Fixed-Price, construction contract for Access Control Points (ACP) in support of the National Geospatial Intelligence Agencys (NGA) West Facilities Modernization (WFM) program in St. Louis, MO.The ACPs will be used to support checking of personnel IDs and inspection of personnel vehicles prior to providing controlled access to the Main Operations Building (MOB) and Central Utility Plant (CUP). The ACPs require inbound and outbound lanes, gatehouses, ID check booths, overwatches, vehicle inspection areas, and both passive and active vehicle barrier systems. The ACP approach and access control zones will be encompassed by a security fence combined with a 3-wire passive vehicle barrier from the entrance to the ID check/Gatehouse area.Requirement is to construct two Access Control Points (ACP) with ID check booths, gatehouses, overwatches, and covered inspection areas. This project includes fire alarm systems, building information systems, Intrusion Detection System (IDS) installation, Electronic Security System (ESS), and Emergency Monitoring and Control System (EMCS) connections. The project also includes supporting facilities such as electrical service, water, sewer, paving, walks, curb and gutter, storm drainage, site improvements, and sustainability / energy measures The estimated magnitude of the project is between $10,000,000 and $25,000,000. The estimated performance period for completion of construction is 540 calendar days from Notice to Proceed (NTP). Point of Contact: The point of contact for all questions/inquiries is Jay Denker at phone number (816)389-3934 or by email at jay.b.denker@usace.army.mil. Bidder Inquiries are due October 3, 2022 at 1:00 p.m. CST, The point of contact for all questions/inquiries is Jay Denker at phone number (816)389-3934 or by email at jay.b.denker@usace.army.mil.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents