Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

North Smoky Hills Graveling
Renovation
Post-Bid

North Smoky Hills Graveling
Renovation
Post-Bid

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

2021 Utility, Street and Alley Improvements - Group 1
Results
$3,500,000 est. value
New Ulm, MN

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Raw Water Main Reroute Project-North Well Field
Results
New Ulm, MN

Well Field Mound and Access Restoration Project
Infrastructure
Post-Bid
$656,000 est. value
New Ulm, MN

CSAH 34 Mill and Overlay and CSAH 35 Reconstruct
Infrastructure
Results
$3,576,810 est. value
MN

20th South Street Reconstruction Project
Infrastructure
Post-Bid
New Ulm, MN 56073

Grading and Riprap
Infrastructure
Results

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2021 Summit Avenue Improvements
Infrastructure
Results
Hanska, MN 56041

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Last Updated 08/08/2022 03:32 AM
Project Title

FEMA Shelter

Physical Address View project details and contacts
City, State (County) Springfield, MN 56087   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK: The work includes the construction of approximately: Construction of a FEMA storm shelter including precast bleachers, block retaining walls, concrete walks / plaza, concrete stairs, bituminous trails, railings, storm sewer, sanitary sewer, and watermain., all in accordance with Plans and Specifications. COMPLETION OF WORK: The work shall be substantially complete by August 31, 2023 OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregu larities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents