Similar Projects
Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

Hanford Integrated Tank Disposition Contract
Alteration
Bidding
WA

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Winslow Water Tank Replacement Project
Term Contract, Alteration
Bidding
Bainbridge Island, WA

Above Ground Storage Tank Internal Inspection
Term Contract
Post-Bid
Yakima, WA 98901

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Reported 12/10/2021 12:00 AM
Project Title

Actuator Replacement Project Fabrication

Physical Address View project details and contacts
City, State (County) Richland, WA   (Benton County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Actuator Replacement Project Fabrication: fabricate the components required to support the installation of new valve actuators in the tank farms and the 242-A evaporator.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents