Similar Projects
Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Avery Road Culvert Repair
Post-Bid
Cold Spring, NY 10516

2020 Town-Wide Drainage Improvements
Post-Bid
Hopewell Junction, NY 12533

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Culvert Replacement
Infrastructure
Bidding

Rehabilitation of Large Culverts LC058-20 and LC154-20 on Summit Road CR 58 and Newport Road CR 154
Post-Bid
Less than $600,000 est. value
Newport, Schuyler, NY

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Drainage Sweeping, Various NY State Routes
Infrastructure
Bidding
$600,000 est. value
NY

Emmonsburg Road (CR 130) - Road Slope Armoring
Post-Bid
Salisbury Center, NY 13454

Lasalle Park Shoreline Protection Project
Results
$5,000,000 to $10,000,000 est. value
Buffalo, NY 14207

Deerfield Tank Slope Stabilization Improvements
Infrastructure
Bidding
$350,000 est. value
NY

Lakewood Precision Swale Stormwater Retrofits
Post-Bid
Lakewood, NY 14750

Culvert Replacement Project - Hulbert Hollow Road over a Tributary low Road over a Tributary to Michigan Creek
Results
Spencer, NY 14883

Last Updated 01/11/2022 12:52 PM
Project Title

Replacement of Livonia Center Road Culvert over Kinney Creek

Physical Address View project details and contacts
City, State (County) NY   (Livingston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the removal of the existing Livonia Center Road culvert over Kinney Creek and replacing it with a new precast concrete box culvert. The work also includes cast-in-place concrete wingwalls, placement of stone fill erosion/scour protection, guiderail installation and road reconstruction within the project limits.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents