Similar Projects
AMA Drainage Improvements
New Construction, Infrastructure
Bidding
Hahnville, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Naquin Street Sewer Lift Station
Renovation
Post-Bid
Less than $465,000 est. value
Houma, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Sunshine Wastewater Treatment Plant - Effluent Pump Station Rehabilation
Renovation
Results
$359,000 est. value
Sunshine, LA

Tangi Lakes LS & FM Improvements
New Construction
Post-Bid
$580,000 est. value
Hammond, LA

Construction Of West Monroe Pump Station Repairs
New Construction
Results
Monroe, LA

Pete's Highway Lift Station
New Construction
Post-Bid
Denham Springs, LA

River Pump Station Hazard Mitigation
Renovation
Results
Baton Rouge, LA

Farmsite Pump Station Force Main from Pump Station R2-01 to Riverbend Pond
New Construction
Post-Bid
Chalmette, LA

Lift Station and Blower Controls Electric Panels
New Construction, Alteration
Results
LA

High Lift Pump Room and the Panola Pump Station Improvements
New Construction
Post-Bid
New Orleans, LA

First Camellia (PS 510), Second Camellia (PS 511) and W. Camellia (PS 512) Sewer Lift Station Upgrades
Renovation
Results
Slidell, LA

Des Jacques Westgate Regional Pump Station
New Construction
Post-Bid
Scott, LA

Fulton at Mississippi and Fulton at Nebraska Lift Station D6-4 and D6-7 Rehabilitation
Renovation
Results
Gretna, LA

Last Updated 12/07/2021 07:38 AM
Project Title

Pump Station 279 Improvements City-Parish Project

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA   (East Baton Rouge County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pump station 279 improvements - this work includes Bypass pumping, cleaning and dewatering of existing wet well, removal of Existing pumps, piping, valves and electrical from the dry well and Abandonment of the dry well, rehabilitation of existing wet well, Installation of submersible pumps, base elbows, guide rails, piping, valves and electrical, electrical wiring interconnection of new equipment to terminal junction box/control panel, removal and replacement of concrete driveway, perform startup, site restoration and cleanup.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents