Similar Projects
Mechanical/HVAC Trade Contract Services
Bidding
Ocala, FL

Replacement of AHU 9 - Halifax Health 4th Floor CVOR
Bidding
Daytona Beach, FL 32116

Addition and Modification of the Hood and Grease Duct in the Existing Player Lounge
Post-Bid
Fort Myers, FL 33913

On-Call and/or Routine Scheduled HVAC Preventative Maintenance, Emergency Repairs and Support for HACFM
Term Contract
Post-Bid
Fort Myers, FL 33916

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

HVAC Contractor Services
Term Contract
Post-Bid
Saint Cloud, FL 34769

Governmental Center (GCC), HVAC Replacement AHU 6N
Term Contract
Results
West Palm Beach, FL 33401

N059--FY20: Hot Deck Replacement
Post-Bid
Gainesville, FL 32608

Governmental Center (GCC) HVAC Replacement AHU 3N
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Heat Pump AHU Replacement (SBE Set Aside)
Results
Miami, FL 33136

Fort Myers High School HVAC Upgrades
Post-Bid
Fort Myers, FL 33901

Controlled Humidity Protection System Services
Results
Avon Park, Bradenton, Fort Myers, Palmetto, Saint Petersburg, West Palm Beach, FL

F Building VAV Replacements, HVAC Unit Cleanings and Related Duct Work
Term Contract
Post-Bid
Less than $195,000 est. value
Saint Petersburg, FL 33701

Reported 05/15/2020 12:00 AM
Project Title

Teague Middle School HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Altamonte Springs, FL 32714   (Seminole County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager at Risk to provide construction services to appropriately renovate the HVAC system for Teague Middle School. Included with the construction services will be the pre-construction services that will require the CM's close coordination with the Engineering team for scope prioritization based on cost and phasing strategy, along with receiving and storing owner provided HVAC equipment which will be delivered prior to the start of construction and providing and installing temporary (rental) air cooled chiller(s). This project consists of a removal and replacement of water cooled chillers with air cooled chillers, pumps, air handling units, chiller piping connections, hvac controls, removal and replacement of VAVs, chilled water fan coil units, cleaning the ducts, and test and balance for Teague Middle School.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents