Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Lake Park Road Box Culvert Repair
Infrastructure
Bidding
Valdosta, GA 31601

Majestic Circle Drainage Repairs
Infrastructure
Bidding
Avondale Estates, GA

Dressler Ditch Improvements
Post-Bid
Rincon, GA 31326

CDBG Engineering Services
Post-Bid
Alma, GA

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

North Fork Nancy Creek Stream Restoration Project
Results
Brookhaven, GA 30319

French Drain
Alteration
Bidding
Decatur, GA 30032

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Augusta Canal - Long Gate Spillway Repair
Infrastructure
Bidding
Augusta, GA

Street and Drainage Improvements to Oak Lane
Post-Bid
Less than $250,000 est. value
Argyle, GA 31623

Drainage Improvement for Denmark Fitness Center
Results
Forsyth, GA 31029

2022 Drainage Improvements
Infrastructure
Bidding
Albany, GA

Reported 03/25/2022 12:03 PM
Project Title

Drainage Improvements - Hampton Trail

Physical Address View project details and contacts
City, State (County) GA   (Rockdale County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Provide all labor, materials, and equipment for the drainage improvement project at 2182 Hampton Trail. Work will generally include removal of an existing 72”x 60” elliptical corrugated metal pipe (CMP), installation of a new 26’ wide by 5.86’ high bottomless arch culvert, installation of other drainage structures, and construction of roadway improvements, as depicted in the construction plans. Additionally, provide all necessary purchasing, coordination, rock excavation and removal, supervision, mobilization, traffic control, erosion and sedimentation control, construction staking, demolition, removal, disposal, utility protection and relocation, clearing, grubbing, excavation, grading, compaction, paving, marking, cleanup, express footing drawings, and other services required for the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents