Similar Projects
Reported | 03/25/2022 12:03 PM |
Project Title | Drainage Improvements - Hampton Trail |
Physical Address | View project details and contacts |
City, State (County) | GA (Rockdale County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | All Bids Rejected |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope: Provide all labor, materials, and equipment for the drainage improvement project at 2182 Hampton Trail. Work will generally include removal of an existing 72”x 60” elliptical corrugated metal pipe (CMP), installation of a new 26’ wide by 5.86’ high bottomless arch culvert, installation of other drainage structures, and construction of roadway improvements, as depicted in the construction plans. Additionally, provide all necessary purchasing, coordination, rock excavation and removal, supervision, mobilization, traffic control, erosion and sedimentation control, construction staking, demolition, removal, disposal, utility protection and relocation, clearing, grubbing, excavation, grading, compaction, paving, marking, cleanup, express footing drawings, and other services required for the project. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |