Similar Projects
Elevator Maintenance
Bidding
Arlington Heights, IL

Elevators, ADA Lifts, Chair Lifts, and Portable Pool Lifts: Maintenance and Repair
Bidding
Chicago, IL

Escalator, Passenger Elevator, Freight Elevator, Dumbwaiter and Wheelchair Lifts 3rd Party Inspection
Post-Bid
Chicago, IL

JRTC Elevator Maintenance and Repair #J0205
Term Contract
Post-Bid
Chicago, IL

UIC - Building 975 Elevator Upgrades (School Of Public Health)
Results
Chicago, IL 60612

Elevator Maintenance and Repair Services
Results
Oak Park, IL

CPS Sutherland ES Vertical Platform Lift Replacement
Bidding
Chicago, IL 60643

Elevator Preventive Maintenance & Services
Term Contract
Post-Bid
IL

IVHC - FY21 - Elevator Maintenance and Repair Services
Results
Chicago, IL

Elevator Equipment Preventative/Maintenance Services
Term Contract
Post-Bid
Addison, Lombard, Westmont, Wheaton, IL

Elevator Inspection Services
Term Contract
Post-Bid
Chicago, IL 60606

Elevator Maintenance and Related Services at the North Federal Center
Term Contract
Post-Bid
Chicago, IL 60604

Elevator Maintenance
Term Contract
Post-Bid
Chicago Heights, IL 60411

Harold Washington SSA Elevator Upgrades
Post-Bid
$5,000,000 to $10,000,000 est. value
Chicago, IL 60661

Commercial Elevator Maintenance Services
Term Contract
Post-Bid
Arlington Heights, IL 60005

Reported 04/01/2021 12:00 AM
Project Title

Argonne Bldg 362 Elevator Modifications

Physical Address View project details and contacts
City, State (County) Lemont, IL 60439 (Cook, DuPage Counties)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Partial demolition of existing elevator No. 1. Demolish the existing elevator cab down to the existing platform. Remove all hall call buttons and hall elevator floor identifiers and fascia. Remove the existing elevator controller and partial demolition of sprinkler piping in elevator machine room, electrical connections and existing elevator machine room exhaust equipment. The existing elevator machine equipment to be replaced. The existing hoist rails, and elevator platform are to remain. New modernization work will bring elevator No. 1 up to comply with current ANSI ASME A17.1/CSA B44. Provide and install new cab shell, interior finishes, lighting, new elevator controller, operator, all new hall fascia and patch and repair existing masonry walls where required. Provide and install a new air cooled condensing unit connected to a new fan coil unit to serve the elevator machine room. Provide and install all piping to connect ventilation equipment as required. Provide and install new sprinklers in the elevator machine room and top and bottom of the elevator shaft to comply with current ASME A17.1/CSA B44. Provide and install new electrical connections to connect the elevator into the building’s existing emergency power.

Details

Division 14 - Conveying Equipment, Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents