Similar Projects
Sidewalk Replacement for Various Locations
Post-Bid
Hartford, CT 06120

Sidewalk Replacement for Various Locations WMBE
Post-Bid
$500,000 est. value
CT

ADA Concrete Sidewalk Ramps
Results
Hartford, CT 06103

Silas Deane Highway Pedestrian Improvements
Results
$1,681,697 to $1,701,513 est. value
Rocky Hill, CT 06067

Route 20 Construction and Installation of High-Intensity Activated Crosswalk (HAWK) System
Post-Bid
East Granby, CT

Blish Memorial Park Walkway Construction
Results
Less than $54,000 est. value
Marlborough, CT

New Parking Lot at Gaylord Towers
Post-Bid
Bristol, CT 06010

Lower Garage Ramp Restoration
Results
$237,500 to $250,000 est. value
Hartford, CT 06103

Storm Drainage and Sidewalk Ramp Rehabilitation
Infrastructure
Post-Bid
Glastonbury, CT 06033

Boulevard to Train Station
Results
Berlin, CT

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Main Street Pedestrian Improvements
Results
Less than $385,835 est. value
East Hartford, CT

Sidewalk Reconstruction
Infrastructure
Post-Bid
Plainville, CT

Miscellaneous Concrete Sidewalks
Term Contract
Results
Berlin, CT

On-Call Excavation Contractor Services
Term Contract
Post-Bid
East Windsor, CT

Reported 10/30/2021 12:00 AM
Project Title

Silver Lane Sidewalk Construction Project - Phase 1

Physical Address View project details and contacts
City, State (County) East Hartford, CT 06118   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Silver Lane Sidewalk Construction Project – Phase 1 includes the construction of approximately 1,500 linear feet of bituminous sidewalk along Silver Lane between Gold Street and Simmons Road. In addition to the sidewalk construction, the project includes the construction of a bridge to carry the sidewalk over the Willow Brook, streetscape furniture and new bus shelter amongst other items.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents