Similar Projects
Electronic Surveillance System for Cedar Point Fishing Pier
Infrastructure
Design
$30,000 CJ est. value
Coden, AL 36523

2018 PAYGO- North McGregor Avenue Reconstruction
Infrastructure
Bidding
$2,000,000 CJ est. value
Mobile, AL 36608

2018 PAYGO- North McGregor Avenue Reconstruction
Infrastructure
Bidding
$2,000,000 CJ est. value
Mobile, AL 36608

Pressure Washing/Soft-Wash Services
Term Contract
Sub-Bidding
Mobile, AL 36602

Grounds Maintenance for the Mobile County Bay Haas Office
Term Contract
Sub-Bidding
Mobile, AL 36604

Whistler Street Sidewalk Improvements
Post-Bid
$158,650 to $193,895 est. value
Prichard, AL 36610

Asphalt Services and Labor
Post-Bid
Mobile, AL

A New Athletic Track at Saraland High School
New Construction - 3,950 SF
Results
Saraland, AL 36571

Copeland-Cox Tennis Center - ADA Improvements
Results
$502,900 est. value
Mobile, AL 36608

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

Dauphin Island Community Center
New Construction, Infrastructure
Bidding
$370,000 CJ est. value
Dauphin Island, AL 36528

Grounds Maintenance for James T Strickland Youth Center and Annex
Term Contract
Sub-Bidding
Mobile, AL 36617

Semmes Municipal Complex
New Construction
Post-Bid
Semmes, AL

Last Updated 08/12/2022 03:03 AM
Project Title

Safety Improvements (Curb Ramp Installations) on SR-16 (US-90), SR-17 (US-45), SR-42 (US-98), and SR-188 at Various Locations

Physical Address View project details and contacts
City, State (County) Mobile, AL 36602   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $291,469 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Mobile Constructing the Safety Improvements (Curb Ramp Installations) on SR-16 (US-90), SR-17 (US-45), SR-42 (US-98), and SR-188 at various locations in the Southwest Region (Mobile Area) as indicated in the plans. The Bracket Estimate on this project is from $276,983 to $338,534 . Contract Time: 60 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids.The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 047 - Safety Improvements (Curb Ramp Installations) on SR-16 (US-90), SR-17 (US-45), SR-42 (US-98), and SR-188 at Various Locations *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents