Similar Projects
US 12/ Walla Walla River Bridge - Bridge Painting
Renovation
Conception
$2,365,000 est. value
Wapato, WA

I-5 / I-5 Over NE 78th St - Replace Expansion Joints
Infrastructure
Conception
$1,042,000 est. value
Tacoma, WA 98409

WA NPS BP Olym 2019(2) Olym Bridge Preservation
Renovation
Design
$1,000,000 to $2,000,000 est. value
Port Angeles, WA 98362

WA NPS BP Olym 2019(2) Olym Bridge Preservation
Renovation
Design
$1,000,000 to $2,000,000 est. value
Port Angeles, WA 98362

236th Street Conduit Installation and I-5 Bridge Crossing
New Construction, Infrastructure, Alteration
Bidding
$500,000 est. value
Mountlake Terrace, WA 98043

I-405/BN RR Bridge to Pedestrian Trail Bridge - Seismic Retrofit
New Construction
Bidding
$15,000,000 est. value
Bellevue, WA 98007

Wooten Wildlife Area Watson Lake Foot Bridge Installation
New Construction
Post-Bid
$120,000 est. value
Olympia, WA

Bridge Painting Kiwanis Beach
Renovation, Infrastructure
Post-Bid
Republic, WA 99166

Improvement of Arch Bridge on Lamar Road
Renovation, Infrastructure
Results
$1,304,776 est. value
Prescott, WA 99348

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

US 12/Snake River Vaughn Hubbard Bridge EB - Bridge Painting
Renovation, Infrastructure
Conception
$10,004,000 est. value
Pasco, WA 99301

SR 520/I-5 to Montlake I/C and Bridge Replacement Project
New Construction
Design
$725,000,000 to $775,000,000 est. value
Seattle, WA 98113

US 2 Non-Motorized Shared Path
Renovation, Infrastructure
Bidding
$1,080,000 est. value
Monroe, WA

Auburn Station Pedestrian Bridge Stair Repair
Renovation, Infrastructure
Post-Bid
Auburn, WA 98001

Columbia County 2017 Bridge Rail (Turner and South Touchet Bridge Rail Update)
New Construction, Infrastructure
Results
$275,000 est. value
WA

Last Updated 07/08/2022 02:22 PM
Project Title

I-90, Bridge Deck Preventative Preservation - Patching

Physical Address View project details and contacts
City, State (County) (Adams, Spokane, Whitman Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents