Similar Projects
N Washington St. over Luzerne/Susquehanna Railroad
New Construction, Infrastructure
Design
$1,900,000 est. value
Wilkes-Barre, PA 18702

Leaman Place Yard Expansion -Phase II
Alteration
Bidding
$1,700,000 est. value
Gordonville, PA 17529

Rehabilitate Railroad Tunnel
Renovation
Post-Bid
Avella, PA

DCR 21-1:Hallwood
Renovation
Post-Bid
Oakmont, PA 15139

2019/2020 Rail Freight Assistance Program Track Rehabilitation Project
Results

2019/2020 Rail Freight Assistance Program Track Rehabilitation Project
Results

Gettysburg Lincoln Railroad Station - Renovation
Renovation, Term Contract - 2,400 SF
Construction
Gettysburg, PA 17325

Pittsburgh Station SOGR
Alteration
Construction
$150,000 est. value
Pittsburgh, PA 15222

Wheeling & Lake Erie Railway for Steel Walkway Grating, Steel Walkway Stanchions and Hardware, and Timber Bridge Tie Disposal.
Post-Bid

Internal Rail Flaw Detection Services
Term Contract
Results
Philadelphia, PA

Wilkinsburg Train Station - Phase 4 - Interior Fitout
Post-Bid
Pittsburgh, Wilkinsburg, PA 15221

Industrial Track Rehabilitation
Infrastructure
Results
PA

Railroad Project - Boyd Station
Infrastructure
Post-Bid
Danville, PA

FY22 - Restroom Renovations
Alteration
Post-Bid

Industrial Track Rehabilitation Contract No. GS 2021-01
Alteration
Post-Bid
Johnstown, PA 15901

Last Updated 06/27/2022 03:06 PM
Project Title

Wayne Junction SFC Rehabilitation - General Construction

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19144   (Philadelphia County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally consists of, but is not limited to, the following: 1. The design, supply, construction, testing, and commissioning into full service of four new SFC systems, with an input of 13.2 kV, 60 Hz, 3-phase and an output of 36/24/12 kV, 25 Hz, single phase. The continuous full-load power capacity of the new SFCs shall be not less than 15 MVA. The total station capacity shall be 60 MVA with all four SFCs in operation.

Details

Division 01 - General Requirements.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 34 - Transportation, Traction Power Distribution, High Power Static Frequency Converters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents