Similar Projects
Palmera Bluff Section 1 Street Drainage and Utility Improvements
Post-Bid
Round Rock, TX 78664

Palmera Ridge Section 9 - Street - Drainage - Utility Improvements
Post-Bid
Round Rock, TX 78664

2019 Reclamation Reconstruction Task Order Contract Package 6
Results
San Antonio, TX 78205

Construction of Drainage Improvements along Meadow Ranch Parkway within Fort Bend County Municipal Utility District No. 194
Results
Richmond, TX

San Gabriel Parkway Phase 1 - Street - Drainage & Utility Improvements
Post-Bid
Leander, TX 78641

Oyster Cultch Placement
Term Contract
Results
Galveston, TX 77550

Brookview Court Alley Paving and Drainage Rehabilitation
Post-Bid
Sachse, TX

Capp Smith Park Lake Retaining Walls 2019
Results
$550,000 est. value
Watauga, TX 76148

Siena Section 31 Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX 78664

Water, Sanitary Sewer and Storm Drainage Improvements for Woodcreek Phase 2D3
Results
Dallas, TX

Star Ranch Section 7 Phase 7 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX 78664

Channel Repairs at Greens Bayou and Addicks Reservoir Watersheds (2016 Disaster Recovery Package 1-B)
Results
$1,074,069 est. value
TX

Construction of Water, Sanitary, and Drainage Facilities in Park Vista Drive
Post-Bid
TX

Spot Erosion Repairs in the Cypress Creek Watershed for the Harris County Flood Control District
Results
TX

Santa Rita Ranch South Section 7C - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Liberty Hill, TX

Last Updated 10/14/2019 08:19 AM
Project Title

Detention Channels and Detention Pond to Serve P150

Physical Address View project details and contacts
City, State (County) TX   (Waller County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Scope of Project: 1. Site Preparation. 2. Approximately 442,380 CY of Detention Pond and Detention Channel Excavation, including Placement in Spoil Site. 3. Approximately 3,400 LF of 10’ Concrete-Lined Pilot Channel in Detention Pond. 4. Approximately 18,560 LF of Backslope Interceptor Swale and 33 Backslope Interceptor Structures with 24” Corrugated Metal Pipe and Concrete Rip Rap. 5. Approximately 15,025 SY of 5” Thick Concrete Slope Pavement. 6. Approximately 895 LF of 4’ x 3’ Reinforced Concrete Box Culvert and all appurtenances. 7. Approximately 200 LF of 9’ x 5’ Reinforced Concrete Box Culvert and all appurtenances. 8. Storm Water Pollution Prevention Control.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents