Similar Projects
Last Updated | 06/15/2022 12:10 AM |
Project Title | Entryway Steps Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Houlton, ME 04730 (Aroostook County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete, Finishes/Exterior |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide and furnish all necessary labor and materials in connection with the replacement of entryway steps at the Sheriff’s Office Building, 25 School Street, Houlton, Maine. a. Provide any and all subcontract work, as needed. b. The entryway steps are located on the School Street side of the building (that service the Dispatch reception area of the building) and consists of replacing the existing concrete steps and steel rails with new steps and railings constructed of pressure treated lumber and composite decking. (1) The existing concrete landing and top two (2) steps shall be retained. (2) The existing steel rails shall be retained and reinstalled on the new wood railings. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |