Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Replacement of Distribution Water Main and Appurtenances
Infrastructure
Bidding
Staten Island, NY 10301

Cleaning, Painting, And Basic Maintenance Of Fire Hydrants
Term Contract
Bidding
Bronx, Brooklyn, New York, Staten Island, NY 10065

2021 Water Maintenance Materials
Term Contract
Post-Bid
Peekskill, NY 10566

Water District No. 2 - Phase 7
Post-Bid
Lake Placid, NY 12946

Water System Improvements - Town of Hamburg and West Seneca, City of Lackawanna
Results
Hamburg, Lackawanna, West Seneca, NY

Water System Improvements in the Towns of Amherst and Cheektowaga
Term Contract
Results
Amherst, Cheektowaga, NY

Lab Of Ornithology Warehouse Demolition
Demolition
Construction
$35,000 est. value
Ithaca, NY 14850

PS 163X New Building and Demo of Existing Building
Demolition
Bidding
$4,000,000 est. value
Bronx, NY 10457

Demolition and Disposal
Demolition
Post-Bid
Stanfordville, NY 12581

Water Consolidation Improvement Project Phase 1
Results
Hamburg, NY 14075

Water System Improvements
Infrastructure
Bidding
Buffalo, NY 14226

Energy Recovery Facility Condensate Pipeline Replacement
Post-Bid
Syracuse, NY 13202

Water Supply Improvements
Results
Less than $3,075,000 est. value
Philadelphia, NY 13673

Last Updated 02/08/2022 11:40 AM
Project Title

New York State Office for People with Developmental Disabilities, Sunmount DDSO, Buildings 25 and 26 Water Main Repair and Building Demolition and Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Tupper Lake, NY 12986   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Demolition, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work in the Water Main Repair Contract CR #14 includes but is not limited to; Installation of approximately 343 LF of 8” water main. Installation of three (3) fire hydrant assemblies, two (2) tapping sleeves and valves, and two (2) gate valves. Removal of existing water service box that serves Buildings 25 and 26. Removal of one (1) inoperable hydrant. Reconstruction of all asphalt, concrete curb, and lawn areas disturbed due to water main repairs. The estimated contract value for the Water Main Repair Contract is $100,000 - $130,000. The scope of work in the Demolition and Asbestos Abatement Contract CR #15 includes but is not limited too; Abatement of all hazardous materials within Buildings 25 and 26 in accordance with all local, state, and federal rules, regulations, guidelines, and variances. Complete demolition and removal of Buildings 25 and 26, including slabs and foundations, following abatement operations. Cutting and capping of all utility services. Backfilling, topsoil, mulching, and seeding of all areas impacted by demolition operations. The estimated contract value for the Demolition and Asbestos Abatement Contract is $250,000 - $275,000.

Details

Division 02 - Existing Conditions, Demolition, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 31 - Earthwork, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Turf and Grasses, Seeding.
Division 33 - Utilities, Water Utility Distribution Piping, Site Water Utility Distribution Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents