Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Rock Canyon Park Restroom and Playground Replacement
New Construction, Infrastructure
Bidding
$920,000 CJ est. value
Provo, UT 84604

UDOT Saratoga Springs MS4 Project
Infrastructure, Renovation
Bidding
$250,000 CJ est. value
Saratoga Springs, UT 84045

Utah Valley University (UVU) Computer Science Building Roof Replacement
Renovation
Sub-Bidding
$680,000 CJ est. value
Orem, UT 84058

Spanish Fork Community Network Building Bid Package: BP-02 - All Remaining Trades BP-01-Metal Building
New Construction, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Spanish Fork, UT 84660

Saratoga Dignity Care Assisted Living - Rebid
New Construction, Infrastructure - 61,420 SF
Post-Bid
$20,000,000 CJ est. value
Saratoga Springs, UT 84045

Institutional Residence Remodel
Post-Bid
$207,000 est. value
Orem, UT 84058

Lockhart Locker Room Remodel
Renovation
Results
Orem, UT 84058

Remodel Lakemount Manor
Results
Less than $3,100,000 est. value
Orem, UT 84058

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Last Updated 08/16/2022 08:07 AM
Project Title

UVU BRC Tower & Fencing

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Business Resource Building: Purchase ham radio tower, install footing & tower. Purchase and install chain link fencing and gate. Budget: $125,000.00 Trades: chain link fencing, concrete, rebar.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents